| Opened | SR # | Site Name | SR Type | Status | Last Labor Activity | Description | Contact Last | Billable | Approver | Non NxGen Job Id | Asset # | Owner | Customer PO# | Customer Work Order # | Customer Authorization # | Created Last Name | Created By | SR LOB | Price List | Cost List | Date Committed | Owner Last | Agreement # | Entitlement | Contact First | Contact Work Phone # | Customer Tracking # | Serial # | Product | Model # | Eqp. Contract # | Component | Sub Component | Opportunity # | Claim Status Update Date | Rate List | Hold Reason Code | Hold Effective Date | Priority | Agreement LOB | SR Subtype | Substatus | Branch | Team | L&M Write Off Reason Code | Override Billable Reason | Non Billable Reason | Currency | Oracle Order # | Last Material Activity | Location | Account |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 11/1/2017 01:17:24 PM | 1-57575415130 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 10/19/2017 | E306 RTP CHILLER AUTO AIR VENT REPLACEMENT & MISC. SERVICE - Furnish Qty-1 B&G Series 78 Auto Air Vent - Removal and Replacement of Faulty Spirax/Sarco Air Vent on Air Separator - Replacement of 1/4" Ball Valve and Copper Line on Low Side of Andover Controls' Differential Pressure Transmitter (The above work has already been performed and completed) |
BAFFONE | Y | CDOLPHL | 6501807345 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 11/3/2017 01:17:25 PM | Dolphin | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 10/12/2017 11:28:53 AM | 1-57125113604 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 10/13/2017 | E306 RTP CHILLER PUMP#2 - Due to the loss of system glycol and the failure of PUMP#1's Shaft Seal, proactive replacement of PUMP#2's seal is suggested, while system is empty. - Furnish Qty-1 Armstrong Mechanical Seal Kit and Qty-1 Volute Gasket. - Disconnect Wiring on Pump Motor. - Assist DuPont's Pump Team, as needed, in the Removal and Replacement of Seal. - Rewire Pump Motor, Start and Check Operation. * This Quote is Priced such that the DuPont Pump Team will be performing the seal replacement in their shop * |
Barnes | Y | CDOLPHL | 6501807345 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 10/14/2017 11:28:55 AM | Dolphin | PAUL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 10/12/2017 11:26:44 AM | 1-57125113325 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 10/17/2017 | E306 RTP YORK CHILLER MODEL: YCAL0046EE SERIAL: 11531K65368876 - Shutdown and Lock-Out YORK RTP CHILLER according to DuPont & JCI's Safety Requirements. - Depressurize Chilled Glycol Loop, by temporarily draining water/glycol mixture into, empty drums (provided by DuPont. - Remove current "Paddle" Style Flow Switch in YORK Chiller. - Furnish & Install Premium "Thermal" Style Flow Switch: (Stainless Steel Insertion Probe, Remote-Mounted Control Monitor /w Adjustable Relay Output, & Interconnecting Cable) - Furnish & Install necessary pipe fittings for Probe Installation. - Install any necessary Wiring and Conduit. - Make wiring adjustments to Chiller. - Re-Install Glycol with Appropriate amount of Water to attain System Design Concentration of 30%. - Bleed Air from System, using Automatic Vents. - Un-Lock and Restart System, Check for Leaks, Adjust Flow-Switch Settings and Verify Operation. - Prove DuPont with all necessary Documentation. Premium Flow Switch is capable of Sensing flows from 0.083 Ft/Sec (2 GPM)* to 9.83 Ft/Sec (226 GPM)* * Flow rates based on specified velocities through 3" steel pipe |
Barnes | Y | CDOLPHL | 6501807345 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 10/14/2017 11:26:46 AM | Dolphin | PAUL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 10/10/2017 12:46:26 PM | 1-57084202094 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 10/12/2017 | (8K709046 10/17 claim complete-requires review and approval.) Paul stated E306 RTP is experiencing no chilled water system pressure and glycol on the floor. | Barnes | N | Dolphin | 11531K65368876 | CDOLPHL | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 10/12/2017 12:48:16 PM | Dolphin | PAUL | (302) 218-9996 | 11531K65368876 | Chiller, Air Cooled, Scroll, 10-40 Tons | YCAL0046EE46XEB/R410A | 6N280125 | JCI Main US | Waiting for Mgr Approval | 11/1/2017 09:56:06 AM | Routine | Warranty to Equipment | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | No Agmt Change SR Type SubType | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||
| 10/1/2017 06:00:00 AM | 1-55109527850 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 10/31/2017 | Preventive Maintenance | Cozza | N | Administrator | CDOLPHL | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 9/3/2017 02:02:13 PM | Dolphin | 1-P5G75WS | 1-PALS0R5 | Raul | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 9/14/2017 08:55:14 AM | 1-55330460961 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/15/2017 | CHILLER #10 Leaving Chilled Water Temp Sensor and Damaged Cable: - Remove and Replace Damaged Cable from the MicroPanel to the Leaving Chilled Water Temp Sensor. - Remove and Replace Leaving Chilled Water Temp Sensor. - Check Calibration and Accuracy of Sensor. ** This quote also covers the time already spent diagnosing and making temporary repairs on 08/21/17. ** |
Cozza | Y | CDOLPHL | 6501785361 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 9/16/2017 08:55:16 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 9/5/2017 04:12:30 PM | 1-55165238982 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/13/2017 | 6501785365 ABSORBERS #1 - #4 PROVIDE MATERIAL: LITHIUM MOLYBDATE INHIBITOR based on recent Solution Analysis to bring Levels back to Optimal. * The necessary amount of inhibitor was already added to the Absorbers on 08/25/17, due to Customer request for Early Shutdown. This quote is for replenishing what was used of the on-site inhibitor supply. * |
Cozza | Y | CDOLPHL | 6501785365 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 9/7/2017 04:12:31 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 9/5/2017 03:59:57 PM | 1-55164988394 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/05/2017 | 6501785366 Standby chiller support 09/05/2017. | Cozza | Y | CDOLPHL | 6501785366 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 9/7/2017 04:01:10 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/31/2017 12:41:11 PM | 1-55066190528 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/26/2017 | 8/26 Overtime requested by the customer to perform end of season maintenance early due to closure of one of the cooling towers. DuPont Master agreement Labor Rate is $151.20 per hour. 9 hrs x $75.60 = $680.40 |
Cozza | Y | CDOLPHL | 6501785366 | Raul Cozza | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 9/2/2017 12:41:13 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 8/18/2017 01:05:45 PM | 1-54597712254 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/25/2017 | Abs #3, Refrigerant Pump Motor replacement (with customer supplied part) | Cozza | Y | CDOLPHL | Raul Cozza | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/20/2017 01:07:07 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/16/2017 03:39:13 PM | 1-54556841145 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/25/2017 | RUSH ON ABSORBER END OF SEASON SAMPLES: - Extra costs involved for a Laboratory RUSH (24-48hr) on 4 Lithium Bromide Samples. - Extra cost for Expedited Shipping to Laboratory. **(These extra costs are outside the scope of the Contract, and were requested by the Customer, due to End of Season Absorber Shutdown being moved ahead by 1 month)** |
Cozza | Y | CDOLPHL | 6501773542 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/18/2017 03:39:15 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/15/2017 03:50:53 PM | 1-54517796786 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/31/2017 | ABSORBER #1 PURGE PUMP MOTOR STARTER & TRANSDUCER Furnish & Install New Overload Block w/Aux Contact & Motor Contactor for Purge Pump Motor Furnish & Install New Purge Pump Pressure Transducer |
Cozza | Y | CDOLPHL | 6501778019 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/17/2017 03:50:55 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/15/2017 12:40:06 PM | 1-54505335665 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/31/2017 | 6501778777 Trouble shoot ABS #3 Pump issues and check for signs of crystallization |
Cozza | Y | GADM233620 | CDOLPHL | 6501778777 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/17/2017 12:47:10 PM | Dolphin | Raul | (302) 695-7842 | GADM233620 | Chiller, Water Cooled, Absorption (Two-Stage Steam), >1199 Tons | YPC ST 22G | 94211016 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||
| 8/15/2017 08:15:40 AM | 1-54486496905 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/28/2017 | 6501778010 CHILLER #9 BLOWN CONTROL FUSE (DIAGNOSTICS & REPAIRS: - CHILLER #9's had shutdown Friday 8/11/17, blowing the 120V YORK Control Panel Fuse 2 times in a row. - This quote includes the labor involved in responding to and troubleshooting the issue. - Discovered Oil Return Line Solenoid Coil shorted to ground. - Disconnected and Isolated Coil Wiring. - Will furnish new Solenoid Coil, wiring, and electrical interconnects. - Will Test Functionality & Ensure Proper Operation, Voltage & Current. - Will Assist in Restarting Chiller. |
Cozza | Y | CDOLPHL | 6501778010 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/17/2017 08:15:41 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/14/2017 02:12:52 PM | 1-54424901203 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/14/2017 | CHILLERS #8, #9, #10: - FURNISH 20 Gallons of YORK "J" OIL to Replenish Powerhouse Supply for the YORK OT Chillers. - Four 5-Gallon Pales will be delivered to the Powerhouse and stored with the rest of the Chiller Oil Supply. |
Cozza | Y | CDOLPHL | 6501778018 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/16/2017 02:12:54 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/7/2017 01:34:42 PM | 1-53745308445 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/07/2017 | 6501773542 Assist with the Re-start of Chiller #7, after shutdown. Add oil to compressor - check operation. | Cozza | Y | CDOLPHL | 6501773542 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/9/2017 01:42:19 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/4/2017 03:21:40 PM | 1-53714943616 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/18/2017 | 6501773542 Add compressor and motor oil to chillers #8, 9 and 10. Oil is customer supplied. | Cozza | Y | CDOLPHL | 6501773542 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/6/2017 03:23:53 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/4/2017 03:18:06 PM | 1-53714943404 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/21/2017 | 6501773542 Re-locate solution filter canister to Abs. #2, Install new filters and begin filtering. | Cozza | Y | CDOLPHL | 6501773542 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/6/2017 03:20:09 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/3/2017 10:51:51 AM | 1-53649606061 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/03/2017 | 6501773542 Reconfigure Chillers #8,9, and 10- Microgateway per Jerry Carney |
Cozza | Y | CDOLPHL | 6501773542 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/5/2017 10:56:38 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/2/2017 08:18:56 PM | 1-53494663790 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/02/2017 | 6501773542 Due: 2-Aug Desc: Performed manual dilution on absorbers #2and #3. Svc Hrs: N/A Access: N/A Contact: Raul Cozza 302-892-5766 Caller: Kevin Fraze 302-353-0315 |
Cozza | Y | CDOLPHL | 6501773542 | Watkins | JWATKIAD | HVAC-Equipment | JCI Main US | JCI US Main | Dolphin | Raul | (302) 695-7842 | JCI Main US | Urgent | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 8/1/2017 06:00:00 AM | 1-51949088924 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 08/28/2017 | Preventive Maintenance | Cozza | N | Administrator | CDOLPHL | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 7/3/2017 12:15:04 PM | Dolphin | 1-FQQ0SQS | 1-HAKE4G3 | Raul | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 7/1/2017 06:00:00 AM | 1-50899520998 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 08/04/2017 | Preventive Maintenance | Cozza | N | Administrator | CDOLPHL | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 6/3/2017 07:51:18 AM | Dolphin | 1-FQQ0SQS | 1-HAKE4G3 | Raul | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 6/29/2017 10:18:31 AM | 1-51838395351 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/06/2017 | #7: Repairs to Conoflow Actuator | Cozza | Y | CDOLPHL | 6501740662 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 7/1/2017 10:18:33 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/26/2017 01:57:07 PM | 1-51694527366 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/31/2017 | 6501757668 ABSORBER SOLUTION FILTERS Due to HIGH CONCENTRATION of SUSPENDED SOLIDS after the STARTUP of ABSORBER #1, FILTERING was REQUIRED 2 SETS of FILTERS were REPLACED while ABS#1 was in OPERATION. (Labor will be cover by this Quote) FURNISH 24 New PALL Bromide Solution FILTERS to REPLENISH onsite Supply (6 Filters per Changeout) REMOVE and REPLACE current clogged Filters on ABSORBER #1 CLEAN out Canister EVACUATE and RETURN to Service |
Cozza | Y | CDOLPHL | 6501757668 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/28/2017 01:57:09 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/22/2017 08:52:37 AM | 1-51625745587 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/22/2017 | ABSORBERS #1 - #4 PROVIDE MATERIAL: LITHIUM MOLYBDATE & NITRATE INHIBITORS based on recent Solution Analysis to bring Levels back to Optimal. *Included in the price of this quote, is the 1LB of LITHIUM NITRATE proactively added to ABSORBER #1 at startup, due to concerns of internal corrosion.* |
Cozza | Y | CDOLPHL | 6501757664 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/24/2017 08:52:38 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/22/2017 08:49:14 AM | 1-51625507272 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/23/2017 | ABSORBER #3: Furnish & Replace Faulty MicroPanel Keypad Discovered on Startup |
Cozza | Y | CDOLPHL | 6501757663 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/24/2017 08:49:16 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/1/2017 06:00:00 AM | 1-49400587467 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 06/27/2017 | Preventive Maintenance | Cozza | N | Administrator | CDOLPHL | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 5/3/2017 07:52:53 AM | Dolphin | 1-FQQ0SQS | 1-HAKE4G3 | Raul | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 5/8/2017 04:33:45 PM | 1-49598628764 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/30/2017 | ABSORBER #2: FURNISH Qty-2 CONDENSATE FLOW CONTROL VALVES, (to be Installed by MDAVIS) Properly ADJUST Valves to Design Flows during the Startup of the Absorber **Old Valves should be Saved as Emergency Spares** |
Cozza | Y | CDOLPHL | 6501738598 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 5/10/2017 04:33:46 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 5/1/2017 06:00:00 AM | 1-48472723228 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/26/2017 | Preventive Maintenance- SERVICE SCHEDULED IN MAY- CUSTOMER REQUEST TO PULL AHEAD. Due to repairs - the SSV work could not be done in May. | Cozza | N | Administrator | CDOLPHL | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 5/1/2017 01:02:42 PM | Dolphin | 1-FQQ0SQS | 1-HAKE4G3 | Raul | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 4/26/2017 07:55:50 AM | 1-48965085254 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/15/2017 | ABSORBER #1 RUPTURE DISK INSPECTION & REPLACEMENT Perform LOCK-OUT per DuPont & JCI Requirements ENSURE Vessel is Completely Depressurized DISMANTLE BOTTOM Rupture Disk Companion Flanges & REMOVE OSECO Rupture Disk Assembly DISASSEMBLE OSECO (PRDI) Holder, Exposing (PLR) Disk REMOVE Blown Rupture Disk and Hand over to DuPont Personnel for Investigation INSPECT Condition and thoroughly CLEAN 6" Companion Flanges Re-Install OSECO Holder w/ NEW Disk (Provided by DuPont) & Appropriate Ring Gaskets. Properly TORQUE companion Flanges to OSECO's specifications PRESSURIZE ABSORBER Vessel with Nitrogen Pressure and R-134a Trace Gas LEAK TEST Rupture Disks with both Electronic Detector & Soap Bubbles APPLY a thin coat of Vacuum Sealant around Disk Holder Gasket & Flange to Increase certainty of Air Molecule Seal Provide DuPont with any DOCUMENTATION requested ***Any scaffolding necessary to perform work safely will be provided by DuPont*** |
Cozza | Y | GLCM157836 | CDOLPHL | 6501733954 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 4/28/2017 07:55:51 AM | Dolphin | Raul | (302) 695-7842 | GLCM157836 | Chiller, Water Cooled, Absorption (Two-Stage Steam), >1199 Tons | YPC ST 22G | 93211038 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||
| 4/20/2017 11:49:52 AM | 1-48814192110 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/30/2017 | 6501730675 CHILLER #7 LEAK REPAIR REPAIR REFRIGERANT LEAKS FOUND ON 04/17/17: [1] Refrig. Sample Valve, Bottom of Evaporator [2] 1/2" Pipe Thread in Compressor Discharge Line for Transducer [3] Threaded Well in Compressor Discharge Line for RTD [4] Drain Valves on Bottom of Comp. Volutes [5] 1/4" Threaded 45L for Balance Piston Transducer Assist DuPont Instrumentation Technician with Removal of Transducers for Calibration Pressurize Chiller with Nitrogen and verify Leak Free Evacuate Chiller & Perform Vacuum Hold Test **Chiller Re-Charge is covered under JCI Quote#: 1-LP24C0S** |
Cozza | Y | 1-EIZYN96 | CDOLPHL | 6501730675 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 4/22/2017 11:49:53 AM | Dolphin | Raul | (302) 695-7842 | MRP626904 | Chiller, Specialty Drv, Elec Drv - Gearbox, 3000HP | OM3000 | 9081334 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||
| 4/20/2017 09:41:50 AM | 1-48811045116 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/28/2017 | 6501731064 ABSORBER #1 HIGH PRESSURE SAFETY CUTOUT SWITCH During the Seasonal Shutdown, when Absorber #1 was Pressurized with Nitrogen, it was discovered that the High Pressure Cutout Switch was not Opening. Upon further investigation the switch was found to be Defective. SCOPE: FURNISH Qty-1 YORK Approved First Stage Generator High Pressure Cutout LOCK-OUT ABSORBER #1 as needed INSTALL New Switch ADJUST & VERFIY Cutout Setting VERIFY Installation is LEAK-FREE ***This work will need to be performed prior to Seasonal Purge and Start-Up work, due to Safety Switch being Non-Isolatable*** |
Cozza | Y | CDOLPHL | 6501731064 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 4/22/2017 09:41:51 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 4/13/2017 03:53:26 PM | 1-48708552989 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/17/2017 | CHILLER #9 CONDENSER TUBE PLUGGING FURNISH & INSTALL Tube Plugs (Qty= 2 per Tube) in the THREE Condenser Tubes determined by Eddy-Current Analysis to be Restricted with a portion of the tube Unverifiable Tubes Ends will be thoroughly cleaned, precisely honed to appropriate ID, & blown out / completely dried with Nitrogen CPI/PERMA "Pop-A-Plug" V-649-B (1,000PSI Rated) Plugs will be precisely expanded into both ends of restricted tube A Record will be made and provided for DuPont with which Tubes were Plugged This quote also includes the cost of the precision steel honing brushes used to perform the work |
Cozza | Y | CDOLPHL | 6501715797 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 4/15/2017 03:53:28 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/17/2017 02:30:16 PM | 1-48130592782 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/31/2017 | CHILLER #7 ANNUAL MAINTENANCE (2017) REMOVE REFRIGERANT SAMPLE / Send to Lab for CHEMICAL ANALYSIS REFRIGERANT LEAK TEST Chiller and Document Leaks found (repair minor leaks, if possible) TRANSFER R134A Charge to Storage Tank & Record Total Weight (Leaving 5psi on Chiller) FURNISH and INSTALL Compressor Oil Filters, and ALL REFRIG FILTERDRIERS FURNISH and INSTALL Gearbox Oil Filters and Oil (*Gear/Motor Oil furnished by DuPont*) INSPECT Gears and Internal Gearbox Components DISASSEMBLE Motor Coupling, CLEAN, MEASURE/RECORD Cold Alignment REPACK Motor Coupling with Grease and REASSEMBLE DISASSEMBLE Compressor Coupling and CLEAN MEASURE/RECORD Compressor Axial Thrust & Coupling cold Alignment, REASSEMBLE Coupling VACUUM out Compressor Motor BRUSH CLEAN all Oil Cooler Tubes (Gear & Compressor) TRANSFER R134A Charge back into Chiller & RECORD Quantity of Transfer DOCUMENT all Tasks and Provide DuPont with a Comprehensive Report |
Cozza | Y | CDOLPHL | 6501729020 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/19/2017 02:30:17 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/16/2017 02:54:03 PM | 1-48107179309 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/31/2017 | 6501717034 REMOVAL & REPLACEMENT OF ALL ABSORBER RUPTURE DISKS (QTY8) In accordance with DuPont's Vessel Relief Device PM Program, both (Qty2) OSECO Rupture Disks on ABSORBERS #1#4 shall be REMOVED and REPLACED with NEW disks (PROVIDED BY DUPONT) SCOPE PER ABSORBER (Performed ONE at a Time): Perform LOCKOUT per DuPont & JCI Requirements Safely RELEASE Nitrogen Blanket from ABSORBER & Ensure Vessel is Completely Depressurized DISMANTLE Rupture Disk Companion Flanges & REMOVE OSECO Rupture Disk Assemblies DISASSEMBLE OSECO (PRDI) Holders, Exposing (PLR) Disk INSPECT Condition of OLD Disks and Holders (Note any Damage Observed) If Disk Holders are in GOOD Condition, thoroughly CLEAN as per OSECO specs, INSTALL NEW Disks (PROVIDED BY DUPONT) into Holders INSPECT Condition and thoroughly CLEAN 6" Companion Flanges ReInstall OSECO Holders w/ NEW Disks, Appropriate Ring Gaskets, & NEW Flange Bolts Properly TORQUE companion Flanges to OSECO's specifications PRESSURIZE ABSORBER Vessel with Nitrogen Pressure and R134a Trace Gas LEAK TEST Rupture Disks with both Electronic Detector & Soap Bubbles Safely RELEASE Nitrogen & reduced Absorber pressure below atmospheric with vacuum pump APPLY a thin coat of Vacuum Sealant around Disk Holder Gasket & Flange to Increase certainty of Air Molecule Seal Provide DuPont with any DOCUMENTATION requested ***Any scaffolding necessary to perform work safely will be provided by DuPont*** |
Cozza | Y | CDOLPHL | 6501717034 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/18/2017 02:54:05 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/16/2017 10:21:56 AM | 1-48098644929 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/13/2017 | CHILLER #10 EVAPORATOR WATERBOX REPAIRS: CLEAN AND PREPARE WATERBOX HEAD FOR STEEL EPOXY COATING APPLY BELZONA 1121 "SUPER XLMETAL" (PURCHASED UNDER DUPONT PO#: 6501690015) TO FILL IN PITS AND GOUGING CLEAN UP AND ENSURE EPOXY INTEGRITY AFTER 24HR CURE TIME SHAPE HARDENED EPOXY AS NEEDED PAINT ANY BARE STEEL INSTALL REPAIRED DIVISION PLATE WITH NEW CHANNEL GASKETS & SEAL WITH CAULK |
Cozza | Y | CDOLPHL | 6501697258 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/18/2017 10:21:58 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/8/2017 03:16:06 PM | 1-47954372704 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/10/2017 | (6501713698) CHILLER #10 PRV SHAFT SEAL REPLACEMENT REPAIR OF THE FOLLOWING REFRIGERANT LEAK FOUND ON 03/03/17: COMPRESSOR PREROTATION VANE SHAFT SEAL DISMANTLE & REMOVE OLD SEAL ASSEMBLY FURNISH & INSTALL NEW SEAL ASSEMBLY WITH NEW ORINGS, GASKET, & FASTENERS PROPERLY SET & TORQUE SEAL VERIFY TIGHTNESS WITH NITROGEN PRESSURE TEST ***COST OF REFRIGERANT RECOVERY & RECHARGING IS COVERED UNDER DUPONT PO#: 6501711947*** ***EVACUATION / DEHYDRATION WILL BE COVERED UNDER JCI QUOTE# 1M0XUGZP*** |
Cozza | Y | 1-FNV12L6 | CDOLPHL | 6501713698 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/10/2017 03:16:09 PM | Dolphin | Raul | (302) 695-7842 | GACM127699 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 3/8/2017 03:05:06 PM | 1-47953222455 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/22/2017 | (6501713695) CHILLER #10 REFRIGERANT PIPING LEAK REPAIR: REPAIR OF THE FOLLOWING LEAKS FOUND ON 03/03/17: 1-1/2" THREADED LIQUID REFRIGERANT TEE FEEDING OIL COOLER COMP. OIL RESERVOIR EQUALIZING LINE 1/4 THREADED FLARE ELBOW CUT & DISMANTLE REFRIGERANT LIQUID FEED PIPING & FITTINGS HAND THREAD 1/2" STEEL PIPING INSTALL NEW 1-1/2" THREADED TEE, BUSHINGS, STEEL FLARE ADAPTERS, & 3/4"OD FLARED STEEL TUBING VERIFY LEAK TIGHTNESS WITH NITROGEN PRESSURE TEST EVACUATE/ DEHYDRATE CHILLER & PERFORM VACUUM HOLD TEST ***COST OF REFRIGERANT RECOVERY & RECHARGING IS COVERED UNDER DUPONT PO#: 6501711947*** |
Cozza | Y | CDOLPHL | 6501713695 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/10/2017 03:05:08 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/6/2017 07:55:23 AM | 1-47874641859 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/24/2017 | (6501716828) E306 RTP Chilled Water Loop: Calculate appropriate System Fill Pressure based on height of highest coil and specific gravity of the Chilled Water Isolate/Drain Expansion Tank Increase Expansion Tank Bladder Pressure to System Fill Pressure with Nitrogen and Document Set Glycol Feeder to System Fill Pressure and Engage Manually Run Chilled Water Pumps in YORK RTP Chiller at various speeds with all Air Vents open Increase Water Temperature as needed (w/assistance of DuPont) to facilitate air removal Monitor process When all air is removed, isolate airvents required by DuPont, and reopen Expansion Tank to System Train and Provide Literature as needed to DuPont Personnel |
Barnes | Y | CDOLPHL | 6501716828 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/8/2017 07:55:25 AM | Dolphin | PAUL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/6/2017 07:48:24 AM | 1-47873229676 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/14/2017 | (6501711947) CHILLER #10: Due to Refrigerant Leaks discovered on 03/03/2017 the following work is Recommended: Transfer entire R134A charge to YORK Central Recovery Tank Document weight of charge and calculated percentage loss based on design Provide DuPont with documentation Transfer recovered charge back into the Chiller after Leak Repair or DuPont's declining to repair |
Cozza | Y | 1-FNV12L6 | CDOLPHL | 6501711947 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/8/2017 07:48:26 AM | Dolphin | Raul | (302) 695-7842 | GACM127699 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 2/28/2017 01:15:10 PM | 1-47444087633 | DUPONT EXPERIMENTAL STATION | L&M | Closed | (6501715797) CHILLER #9 Condenser Tube Plugging | Cozza | Y | 1-H7K9F6K | CDOLPHL | sr cancelled | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/2/2017 01:16:13 PM | Dolphin | Raul | (302) 695-7842 | GACM127698 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||
| 2/28/2017 12:51:36 PM | 1-47443336030 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/16/2017 | (6501709952) Chiller #10 Annual Maintenance 2017 Remove Refrigerant Sample for Chemical Analysis Refrigerant leak test chiller and document leaks found (repair minor leaks, if possible) Furnish and Change Compressor Oil Filter, and Oil Return FilterDrier Furnish & Install SightGlass in Oil Return Line Change Compressor Oil w/ YORK J (Provided by DuPont) *IF REQUIRED* Disassemble Compressor Coupling and Check Cold Alignment Check LowSpeed Compressor Axial Thrust Reading Reassemble Coupling and ReCheck Compressor Coupling Cold Alignment Vacuum out Compressor Motor and Change Air Filters Change Oil in Compressor Motor Bearings (Provided by DuPont) Check all Chiller Controls, Safeties, and Low Voltage Electrical Connections Documents all tasks and Provide Comprehensive Report to DuPont |
Cozza | Y | 1-FNV12L6 | CDOLPHL | 6501709952 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/2/2017 12:51:37 PM | Dolphin | Raul | (302) 695-7842 | GACM127699 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 2/28/2017 10:21:55 AM | 1-47436369564 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/16/2017 | (6501697258) CHILLER #9 EVAPORATOR WATERBOX REPAIRS: CLEAN AND PREPARE TUBE SHEET DIVISION PLATE TRACKING FOR STEEL EPOXY COATING APPLY BELZONA 1121 "SUPER XLMETAL" (PURCHASED UNDER DUPONT PO#: 6501690015) TO FILL IN PITS AND GOUGING CLEAN UP AND ENSURE EPOXY INTEGRITY AFTER 24HR CURE TIME SHAPE HARDENED EPOXY AS NEEDED PAINT ANY BARE STEEL ASSIST MDAVIS WITH INSTALLATION AND GASKETING OF REPAIRED DIVISION PLATE |
Cozza | Y | CDOLPHL | 6501697258 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/2/2017 10:21:57 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/27/2017 11:57:13 AM | 1-47402231723 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/27/2017 | (EMERG. PO 6501690015) Order Goodway Brushes for tube cleaning. |
Cozza | Y | CDOLPHL | 6501690015 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 3/1/2017 12:01:36 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/13/2017 04:00:32 PM | 1-46720117811 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/28/2017 | 6501701543 CHILLER #9 SHAFT SEAL REPLACEMENT: Based on measurements take over the past 2 months CHILLER#9 seal oil leak has been calculated at 4.975ml/hr. This is double the factory recommended max leak rate of 2.23ml/hr (signal point for replacement). SCOPE: TRANSFER REFRIGERANT CHARGE INTO CENTRAL RECOVERY TANK DOWN TO EPA SPECS BRING UP TO ATMOSPHERIC PRESSURE WITH SITE NITROGEN REMOVE COMPRESSOR COUPLING HUB REMOVE OLD SHAFT SEAL CLEAN & INSPECT INTERNAL COMPRESSOR SHAFT SURFACES CLEAN & RESUSE SHAFT SEAL COVER PLATE (if not damaged) INSTALL NEW SHAFT SEAL COMPONENTS (COLLAR, SEAL, SPRINGS, O-RINGS) CHECK FOR LEAKS & REASSEMBLE COUPLING EVACUATE CHILLER AND PERFORM VACUUM HOLD TEST TRANSFER REFRIGERANT CHARGE BACK INTO CHILLER |
Cozza | Y | 1-H7K9F6K | CDOLPHL | 6501701543 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 2/15/2017 04:00:34 PM | Dolphin | Raul | (302) 695-7842 | GACM127698 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 2/10/2017 08:07:13 PM | 1-46674736377 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/15/2017 | CHILLER # 7 OIL STOCK REPLENISHMENT: FURNISH QTY-6 5gal Pales of YORK "K" (30 Total Gallons) |
Cozza | Y | CDOLPHL | 6501700807 | Reed | CREEDT5 | HVAC-Equipment | JCI Main US | JCI US Main | 2/12/2017 08:07:15 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/10/2017 11:56:30 AM | 1-46661659154 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/10/2017 | Reset York Central Recovery tank scale to zero. | Cozza | Y | CDOLPHL | 6501690015 | Reed | CREEDT5 | HVAC-Equipment | JCI Main US | JCI US Main | 2/12/2017 11:58:28 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/9/2017 11:17:14 AM | 1-46632636600 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/15/2017 | CHILLER #7 OIL LEVEL ADJUSTMENT: Drain and Measure Oil in Shaft Seal Oil Drainage Tank Calculated Shaft Seal Leakage for Last Year Add New YORK "K" Oil (Furnished by DuPont) to Compressor Sump to bring running level up into Top Sight Glass. *The Oil Level is currently running in the Lower Sight Glass. Chiller could shutdown on Low Oil Pressure* |
Cozza | Y | CDOLPHL | 6501690015 | Reed | CREEDT5 | HVAC-Equipment | JCI Main US | JCI US Main | 2/11/2017 11:17:15 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/9/2017 11:06:52 AM | 1-46632636274 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/28/2017 | 6501700761 Chiller #9 Annual Maintenance 2017 Remove Refrigerant Sample for Chemical Analysis Refrigerant leak test chiller and document leaks found (repair minor leaks, if possible) Furnish and Change Compressor Oil Filter, and Oil Return Filter-Drier Furnish & Install Sight-Glass in Oil Return Line Change Compressor Oil w/ YORK J (Provided by DuPont) Disassemble Compressor Coupling and Check Cold Alignment Check Low-Speed Compressor Axial Thrust Reading Reassemble Coupling and Re-Check Compressor Coupling Cold Alignment Vacuum out Compressor Motor and Change Air Filters Change Oil in Compressor Motor Bearings (Provided by DuPont) Check all Chiller Controls, Safeties, and Low Voltage Electrical Connections Documents all tasks and Provide Comprehensive Report to DuPont |
Cozza | Y | CDOLPHL | 6501700761 | Reed | CREEDT5 | HVAC-Equipment | JCI Main US | JCI US Main | 2/11/2017 11:06:53 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/3/2017 12:51:48 PM | 1-46491125544 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/09/2017 | (PO 6501697258) CHILLER #8 EVAPORATOR WATERBOX REPAIRS: CLEAN AND PREPARE TUBE SHEET FOR STEEL EPOXY COATING APPLY BELZONA 1121 "SUPER XL-METAL" (PURCHASED UNDER DUPONT PO#: 6501690015) TO FILL IN PITS AND GOUGING CLEAN UP AND ENSURE EPOXY INTEGRITY AFTER 24HR CURE TIME |
Cozza | Y | CDOLPHL | 6501697258 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 2/5/2017 12:51:50 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/1/2017 03:20:43 PM | 1-46438155392 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/10/2017 | CHILLER #10 EDDYCURRENT EDDYCURRENT TESTING & ANALYSIS OF ALL EVAPORATOR & CONDENSER TUBES (1,582 TOTAL) FINAL REPORT OF TUBE CONDITION WILL BE PROVIDED UPON COMPLETION *NOTE: HEADS MUST BE DOWN AND TUBES CLEANED AND BRUSHED BEFORE TECHNICIAN ARRIVES UNIT MUST BE READY FOR TESTING WITH NO WAITING TIME* **THIS WORK IS CURRENTLY SCHEDULED FOR MARCH 9TH & 10TH ACCESS TO SITE AND POWERHOUSE WILL NEED TO BE ARRANGED & PROVIDED FOR THE TECHNICIAN BY DUPONT** |
Cozza | Y | CDOLPHL | 6501695980 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 2/3/2017 03:20:45 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/1/2017 03:00:55 PM | 1-46437169897 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/24/2017 | CHILLER #9 EDDY-CURRENT EDDY-CURRENT TESTING & ANALYSIS OF ALL EVAPORATOR & CONDENSER TUBES (1,582 TOTAL) FINAL REPORT OF TUBE CONDITION WILL BE PROVIDED UPON COMPLETION. *NOTE: HEADS MUST BE DOWN AND TUBES CLEANED AND BRUSHED BEFORE TECHNICIAN ARRIVES. UNIT MUST BE READY FOR TESTING WITH NO WAITING TIME.* **THIS WORK IS CURRENTLY SCHEDULED FOR FEB. 23RD & 24TH. ACCESS TO SITE AND POWERHOUSE WILL NEED TO BE ARRANGED & PROVIDED FOR THE TECHNICIAN BY DUPONT** |
Cozza | Y | 1-H7K9F6K | CDOLPHL | 6501695977 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 2/3/2017 03:00:57 PM | Dolphin | Raul | (302) 695-7842 | GACM127698 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 1/30/2017 02:38:22 PM | 1-46017866961 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/31/2017 | (Emergency PO) Chiller #8, erosion repair (pitting) to tube sheet in evaporator. | Cozza | Y | CDOLPHL | 65001690015 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 2/1/2017 02:40:34 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/27/2017 11:44:14 AM | 1-45941594047 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/02/2017 | CHILLER #8 SHAFT SEAL REPLACEMENT: Based on measurements take over the past 2 months CHILLER#8 seal oil leak has been calculated at 4.92ml/hr. This is double the factory recommended max leak rate of 2.23ml/hr (signal point for replacement). SCOPE: REMOVE COMPRESSOR COUPLING HUB REMOVE OLD SHAFT SEAL CLEAN & INSPECT INTERNAL COMPRESSOR SHAFT SURFACES CLEAN & RESUSE SHAFT SEAL COVER PLATE (if not damaged) INSTALL NEW SHAFT SEAL COMPONENTS (COLLAR, SEAL, SPRINGS, O-RINGS) CHECK FOR LEAKS & REASSEMBLE COUPLING **REFRIGERANT RECOVERY, EVACUATION, & RE-CHARGE IS COVERED UNDER OTHER QUOTES** |
Cozza | Y | CDOLPHL | 6501694234 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/29/2017 11:44:15 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/26/2017 08:13:06 AM | 1-45899325697 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/06/2017 | Chiller #8 Annual Maintenance 2017 Remove Refrigerant Sample for Chemical Analysis Refrigerant leak test chiller and document leaks found (repair minor leaks, if possible) Furnish and Change Compressor Oil Filter, and Oil Return Filter-Drier Change Compressor Oil w/ YORK J (Provided by DuPont) Disassemble Compressor Coupling and Check Cold Alignment Check Low-Speed Compressor Axial Thrust Reading Reassemble Coupling and Re-Check Compressor Coupling Cold Alignment Vacuum out Compressor Motor and Change Air Filters Change Oil in Compressor Motor Bearings (Provided by DuPont) Check all Chiller Controls, Safeties, and Low Voltage Electrical Connections Documents all tasks and Provide Comprehensive Report to DuPont *All other task, such as Recovery, Evacuation, Oil Sample, and Re-Charge are being performed under other Quotes* |
Cozza | Y | CDOLPHL | 6501692933 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/28/2017 08:13:08 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/24/2017 01:14:21 PM | 1-45848473572 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/25/2017 | YORK Centrifugal Chiller Annual Oil Analysis CHILLERS #7,#8,#9,#10: Remove Oil Samples from all YORK Centrifugals Send to Lab for Analysis Provide Analytical Reports w/ Recommendations for upcoming Annual Chiller Maintenance |
Cozza | Y | CDOLPHL | 6501691913 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/26/2017 01:14:23 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/20/2017 01:04:57 PM | 1-45765849262 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/16/2017 | CHILLER. #8 RELIEF TREE INSTALL Transfer Refrigerant to DuPonts Central Storage Tank according to EPA Specs. Record quantity recovered. Break Vacuum w/Nitrogen & Remove Current Relief Device. Install New 3-Way Valve, Relief Tree, and Relief Devices. Pressurize w/Nitrogen, Leak Test Entire Chiller. Evacuate Chiller & Perform Vacuum Hold Test. Recharge, Run, and Inspect Chiller Performance. ***DuPont will be responsible for providing all material to be installed and for constructing a scaffold that will allow the work to be carried out safely*** |
Cozza | Y | CDOLPHL | 6501691743 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/22/2017 01:04:59 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/20/2017 01:02:44 PM | 1-45765848899 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/27/2017 | CHILLER #8 EDDY-CURRENT EDDY-CURRENT TESTING & ANALYSIS OF ALL EVAPORATOR & CONDENSER TUBES (1,582 TOTAL). FINAL REPORT OF TUBE CONDITION WILL BE PROVIDED UPON COMPLETION. *NOTE: HEADS MUST BE DOWN AND TUBES CLEANED AND BRUSHED BEFORE TECHNICIAN ARRIVES. UNIT MUST BE READY FOR TESTING WITH NO WAITING TIME.* **THIS WORK IS CURRENTLY SCHEDULED FOR JAN. 27TH & 28TH. ACCESS TO SITE AND POWERHOUSE WILL NEED TO BE ARRANGED & PROVIDED FOR THE TECHNICIAN BY DUPONT ON SATURDAY THE 28TH.** |
Cozza | Y | CDOLPHL | 6501691197 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/22/2017 01:02:46 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/19/2017 01:36:46 PM | 1-45734478692 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/19/2017 | Consultive service of 1/18. Emergency work of 1/19. |
Cozza | Y | CDOLPHL | 6501690015 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/21/2017 01:37:45 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/17/2017 02:26:06 PM | 1-45677647587 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 12/28/2016 | CHILLER #8 LOW OIL LEVEL Add appropriate amount of YORK "J" Oil (Customer Supplied) to Chiller #8 to bring back to Normal Operating Level. Measure Seal Oil Leakage and Calculate Leak rates on #8,9,&10 to determine Condition of Shaft Seals. Make necessary Adjustments on Chiller #8's Vane Arm Assembly. Change and Tighten Fasteners. Apply Sealant to Actuator Motor Shaft. |
Cozza | Y | 1-FY0MJZY | CDOLPHL | 6501690015 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/19/2017 02:26:08 PM | Dolphin | Raul | (302) 695-7842 | GACM117864 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 1/9/2017 04:20:42 PM | 1-45487366293 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/10/2017 | Scheduling/consultive: Ruptured Disc replacements on qty 4 absorber chillers | Cozza | Y | CDOLPHL | 6501690015 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 1/11/2017 04:22:14 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 11/16/2016 11:35:43 AM | 1-42462980933 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 11/29/2016 | CHILLERS #8, #9, #10 SOFTWARE UPGRADE: Coordinate with DuPont Operators to Shutdown and Lockout one Chiller at a time UPGRADE all three CHILLER MICROBOARDs to the LATEST Revision of CONTROL LOGIC SOFTWARE (v. C.03F.03) Unlock, Start Up, and Verify CHILLER Control Operation, and Ensure proper Communication with MICROGATEWAY Modbus Interface Chillers #8 and #9 are currently running with the Original Software C.03F.00 Chiller #10 is currently running Software Version C.03F.01 |
Cozza | Y | CDOLPHL | 6501663924 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 11/18/2016 11:35:45 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 10/26/2016 03:42:04 PM | 1-41561145038 | DUPONT EXPERIMENTAL STATION | L&M | Closed | ABSORBERS #2 & #3 PROVIDE MATERIAL: LITHIUM MOLYBDATE INHIBITOR based on recent SOLUTION Analysis to bring Levels back to Optimal. *Inhibitor levels in ABSORBERS #1 & #4 are within the Normal range and do not need adjustment at this time.* |
Cozza | Y | CDOLPHL | 6501611952 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 10/28/2016 03:42:06 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 10/1/2016 06:00:00 AM | 1-40855334427 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 11/01/2016 | Preventive Maintenance | Cozza | N | Administrator | CDOLPHL | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 10/1/2016 07:39:36 AM | Dolphin | 1-FQQ0SQS | 1-HAKE4G3 | Raul | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 9/16/2016 02:23:21 PM | 1-38992535910 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/19/2016 | Chiller #9 Fault; transducer issue | Cozza | Y | CDOLPHL | 6501638582 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 9/18/2016 02:24:12 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/25/2016 11:02:46 AM | 1-37498214070 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/25/2016 | ABSORBER #1 "AUTO-PURGE FAILURE" Troubleshooting, Leak Test & Repairs: Completely DISASSEMBLE Purge Header REMOVE and REPLACE Faulty Solenoid Valve (1SOL) CLEAN all PIPING and THREADS DISASSEMBLE Automatic Ball Valve (2SOL) CLEAN and Re-Assemble RE-ASSEMBLE all PIPING w/ New Sealant and Flange Gasket. REPLACE PURGE CHECK VALVE and TRANSDUCER PRESSURIZE Purge Header and Verify that it is Leak Free and Dry Return Auto-Purge Operation to "AUTOMATIC" |
Cozza | Y | GLCM157836 | CDOLPHL | 6501630558 | Raul Cozza | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/27/2016 11:02:48 AM | Dolphin | Raul | (302) 695-7842 | GLCM157836 | Chiller, Water Cooled, Absorption (Two-Stage Steam), >1199 Tons | YPC ST 22G | 93211038 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||
| 8/3/2016 12:06:50 PM | 1-36853244088 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/11/2016 | ABSORBER #3 Due to the HIGH FREQUENCY of PURGES while Operational, along with CHEMICAL ANALYSIS, Recommend INSTALLING LITHIUM NITRATE TYPE INHIBITOR Perform LEAK TEST of PURGE TREE HEADER and REPAIR any LEAKS FOUND ABSORBER #3 should REMAIN OPERATING in order to properly TREND PURGE FREQUENCY, and determine if there are other possible causes |
Cozza | Y | CDOLPHL | 6501620987 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/5/2016 12:06:51 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/1/2016 02:14:57 PM | 1-36780001028 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/02/2016 | Chris Cooper requested installation of relief device on central recovery liquid line. | Cozza | Y | CDOLPHL | 6501620268 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 8/3/2016 02:19:33 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/1/2016 06:00:00 AM | 1-35841204337 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 08/18/2016 | Preventive Maintenance | Skilton | N | Administrator | CDOLPHL | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 7/3/2016 02:03:41 PM | Dolphin | 1-BM4H6LE | 1-BQV79A9 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 7/26/2016 07:45:27 AM | 1-36516053617 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/27/2016 | Due to weather event, Chillers #8 and 9 will not restart- power failure. Troubleshoot and repair. | Cozza | Y | CDOLPHL | 6501620268 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 7/28/2016 07:47:35 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 7/20/2016 01:54:19 PM | 1-36363184896 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/22/2016 | ABSORBER #1 Due to High Concentration of Suspended Solids after Solution Pump Failure, FILTERING is REQUIRED RELOCATE Canister from ABS#2 to ABS#3 INSTALL NEW HOSES, FLANGE and BALL VALVE (on VP7) FURNISH 18 New PALL Bromide Solution FILTERS to REPLENISH Supply onsite. (6 Filters per Changeout) REMOVE and REPLACE current clogged Filters CLEAN out Canister EVACUATE and RETURN to Service REPLACE FILTERS as needed until SUSPENDED SOLIDS in SOLUTION is at ACCEPTABLE LEVELS |
Cozza | Y | CDOLPHL | 6501616658 | Raul Cozza | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 7/22/2016 01:54:21 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 7/8/2016 02:33:20 PM | 1-36028109391 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/21/2016 | ABSORBER #2 FURNISH 18 New PALL Bromide Solution FILTERS to REPLENISH Supply onsite (6 Filters per Changeout) REMOVE and REPLACE current clogged Filters CLEAN out Canister EVACUATE and RETURN to Service |
Cozza | Y | CDOLPHL | Raul Cozza | Per Raul C | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 7/10/2016 02:33:21 PM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 7/7/2016 11:09:28 AM | 1-35974893871 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/07/2016 | ABSORBER #3 REMOVE and REPLACE Faulty Solenoid Valve (1SOL) CLEAN Purge Header Return Purge Operation back to AUTOMATIC OPERATORS will no longer need to worry about MANUALLY Purging PURGE TANK |
Cozza | Y | CDOLPHL | 6501611959 | per Raul | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 7/9/2016 11:09:29 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 7/6/2016 11:15:42 AM | 1-35942212834 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/06/2016 | ABSORBERS #2, #3, #4 LITHIUM MOLYBDATE INHIBITOR based on recent SOLUTION Analysis to bring Levels back to Optimal. |
Cozza | Y | CDOLPHL | 6501611952 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 7/8/2016 11:15:44 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 7/5/2016 11:19:39 AM | 1-35911259064 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/08/2016 | ABSORBER #1 Furnish NEW Motor Assembly for the Main Solution Pump (This is the entire Pump with exception on the Volute and Impeller) ** The cost of installing the Pump and all Labor associated with bringing ABSORBER #1 back online will be covered by the original JCI Quote # 1-G8EH8ER. ** ** For the price of both Quotes, DuPont will have 1 NEW Solution Pump w/Motor Installed & 1 Rebuilt Solution Pump w/Motor, left onsite as a Spare ** **** Lead Time for the NEW Motor Assembly from the Factory is currently 3 Weeks **** |
Cozza | Y | 2670590 | CDOLPHL | 6501611969 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 7/7/2016 11:19:41 AM | Dolphin | Raul | (302) 695-7842 | Absorption, Chiller, <= 2250 Tons | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||
| 7/1/2016 06:00:00 AM | 1-34566790831 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 07/19/2016 | Preventive Maintenance | Skilton | N | Administrator | CSTETST | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 6/3/2016 09:59:32 AM | Stetson | 1-BM4H6LE | 1-BQV79A9 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 6/23/2016 12:44:06 PM | 1-35376456584 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/23/2016 | Per Chris Cooper: Removal and re-installation of Central SUVA Storage Tank Liquid Line Relief valve 315XRV00219XXX for testing. | Skilton | Y | CDOLPHL | Diane Skilton | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/25/2016 12:47:46 PM | Dolphin | Diane | (302) 695-2288 | Chiller, Water Cooled, High Pressure Centrifugal, 2000-2500 Tons | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 6/23/2016 12:42:02 PM | 1-35376456034 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/28/2016 | ABSORBER #1 Remove and Replace Main Solution Pump Wearing Rings Remove and Replace Seized Studs in Pump Casing Thoroughly Clean all Pump Parts Furnish and Install New Pump Motor Carbon Graphite Bearings Re-Assemble Pump with Original Impeller Re-Install Pump with New Casing Gasket Install new Motor Contactor and Overload Assembly and Re-wire the pump Remove and Replace Fouled Sight-glasses in Absorber Section Evacuate Absorber Re-Install removed Solution through Filters Reset Valves to Original Positions Startup and Purge Absorber Ensure proper Operation |
Cozza | Y | 2670590 | CDOLPHL | 6501608975 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/25/2016 12:42:03 PM | Dolphin | Raul | (302) 695-7842 | Absorption, Chiller, <= 2250 Tons | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||
| 6/20/2016 01:06:45 PM | 1-35270891278 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/27/2016 | ABSORBER #1 Machining will be performed on the Main Solution Pump Rotor Assembly to repair worn parts and return to design specs. Have Impeller Balance verified. (If unbalanced an additional quote will be provided). |
Cooper | Y | CDOLPHL | 6501605952 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/22/2016 01:06:46 PM | Dolphin | Christopher | (302) 695-3558 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/9/2016 07:09:43 AM | 1-34850489163 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/17/2016 | ABSORBER#1 MAIN SOLUTION PUMP INSPECTION Transfer Solution to Generators and Drums Disconnect and Pull Main Solution Pump Inspect, Clean out Solution, Disassemble Pump Inspect Bearings, Impeller, and Pump Seals Install Blank on Pump Volute until Additional Repairs are made |
Cozza | Y | CDOLPHL | 6501600380 PO attached | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/11/2016 07:09:44 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/5/2016 07:07:07 PM | 1-34691988271 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/23/2016 | Inspect and Repair Chiller #8 Evaporator issues, ESL Powerhouse (E315) | Skilton | Y | 1-FY0MJZY | CDOLPHL | 6501598682 | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 6/7/2016 07:11:13 PM | Dolphin | Diane | (302) 695-2288 | GACM117864 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 6/1/2016 06:00:00 AM | 1-33644815808 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 07/18/2016 | Preventive Maintenance Absorber #1 has been under repair. Unable to perform PM. | Skilton | N | Administrator | CSTETST | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 5/3/2016 09:34:13 AM | Stetson | 1-BM4H6LE | 1-BQV79A9 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 5/27/2016 01:15:54 PM | 1-34404994575 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/27/2016 | Chiller #10, not loading. | Skilton | Y | 1-FNV12L6 | CDOLPHL | Diane Skilton | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 5/29/2016 01:18:33 PM | Dolphin | Diane | (302) 695-2288 | GACM127699 | Chiller, Water Cooled, High Pressure Centrifugal, 1100-1499 Tons | OTT4G2-ZBES | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 5/25/2016 07:08:21 AM | 1-34287950346 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/25/2016 | Abs #4; high solution concentration. KF | Cozza | Y | 2670593 | CDOLPHL | Raul Cozza | Dolphin | CDOLPHL | HVAC-Equipment | JCI Main US | JCI US Main | 5/27/2016 07:11:20 AM | Dolphin | Raul | (302) 695-7842 | GNCM94230017 | Chiller, Water Cooled, Absorption (Two-Stage Steam), >1199 Tons | YPC-ST-22G-46-C-X-A | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 5/13/2016 03:26:49 PM | 1-33993104959 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/13/2016 | repair limit switch on chiller#10 | Skilton | Y | CDOLPHL | 6501590122 | Reed | CREEDT5 | HVAC-Equipment | JCI Main US | JCI US Main | 5/15/2016 03:28:56 PM | Dolphin | Diane | (302) 695-2288 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 5/13/2016 11:09:10 AM | 1-33983397168 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/16/2016 | -replace relief devices on chiller#7 -additional Rupture Disk Replacement on Chiller #7 and its Central Storage tank. |
Cozza | Y | CDOLPHL | Raul Cozza | Reed | CREEDT5 | HVAC-Equipment | JCI Main US | JCI US Main | 5/15/2016 11:14:01 AM | Dolphin | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 5/1/2016 06:00:00 AM | 1-32243121739 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/18/2016 | Preventive Maintenance | Skilton | N | Administrator | JMORRIMM | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 4/3/2016 10:58:01 AM | Morris | 1-BM4H6LE | 1-BQV79A9 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 4/21/2016 02:13:51 PM | 1-33069099287 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/30/2016 | ROOFTOP CHILLER E336 SERVICE SCHEDULED FOR 4/30 RUSSELL YETTER CONTACT JIM TIDWELL-302.218.9528 |
Skilton | Y | CDOLPHL | 6501580874 | Reed | CREEDT5 | HVAC-Equipment | JCI Main US | JCI US Main | 4/23/2016 02:17:23 PM | Dolphin | Diane | (302) 695-2288 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 4/5/2016 08:37:25 AM | 1-32345011806 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/05/2016 | Chiller #7 - Troubleshoot Oil Separator | Skilton | Y | JMORRIMM | Diane Skilton | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 4/7/2016 08:38:17 AM | Morris | Diane | (302) 695-2288 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/7/2016 02:17:09 PM | 1-31515692746 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/10/2016 | Chiller #7 - Leak Repair | Cozza | Y | JMORRIMM | 6501560949 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 3/9/2016 02:17:49 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/22/2016 09:27:46 AM | 1-30777898703 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/24/2016 | Chiller 7 (ESL E315) - Labor continuation (Rupture disks) | Cozza | Y | JMORRIMM | 6501537255 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 2/24/2016 09:28:17 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/12/2016 08:44:54 AM | 1-29274542300 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/31/2016 | Remove samples of compressor oil and refrigerant for chemical analysis. Refrigerant leak test chiller and document leaks found (repair “minor” leaks, if possible). Transfer R-134A to storage tank for accurate weight of charge (Leaving 5psi on Chiller). Furnish and change compressor oil filters, and all driers. Furnish and change gearbox oil filters and oil (*Gear/Motor Oil furnished by DuPont*). Inspect gears and internal gearbox components. Disassemble motor coupling and check cold alignment. Repack motor coupling with grease and reassemble. Disassemble Compressor coupling. Check compressor axial thrust readings. Check compressor coupling cold alignment. Reassemble coupling. Vacuum out compressor motor. Brush clean all oil cooler tubes (Gear & Compressor). Transfer R-134A charge back into Chiller. |
Cozza | Y | JMORRIMM | 6501549099 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 2/14/2016 08:44:55 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/10/2016 03:52:03 PM | 1-29228476787 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/12/2016 | Chiller 7 (ESL E315) - Labor continuation | Cozza | Y | JMORRIMM | 6501537255 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 2/12/2016 03:54:12 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/4/2016 02:11:51 PM | 1-29066059613 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/01/2016 | Eddy-Current Testing performed on all Evaporator (1852) and Condenser (2590) Tubes. Detailed report of analysis will be provided to DuPont. Water Box Heads must be removed, all tubes thoroughly cleaned, and scaffolding set up, before technician arrives |
Cozza | Y | JMORRIMM | 6501545663 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 2/6/2016 02:11:53 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/2/2016 12:47:52 PM | 1-28998918974 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/18/2016 | Complete replacement of faulty and obsolete Compressor Pneumatic Vane Actuator w/ integral Pilot Positioner. (The new actuator is the latest model of its kind, thereby making replacements parts readily available in the future.) Replace control air pressure throttling valve. Replace any pneumatic tubing or fittings necessary. Replace pneumatic air filters on for control air and main piston air. Set pressure regulators to design pressures. Set up correct position stroke length and span. Calibrate controls for proper Vane positioning and stable control of Compressor. Check control and operation of both Interstage and Hot Gas Bypass Bypass valves. Ensure that the are working as per design and in conjunction with Vane Actuator. |
Cozza | Y | JMORRIMM | 6501541957 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 2/4/2016 12:47:53 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/29/2016 10:31:01 AM | 1-28882156385 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/01/2016 | Chiller 7 (ESL E315) - Labor continuation | Cozza | Y | JMORRIMM | 6501537255 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 1/31/2016 10:33:21 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/21/2016 01:40:45 PM | 1-28657093467 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish qty-4 rolls of gasket material p/n 028-03242-050. Shipping included. |
Cooper | Y | JMORRIMM | 6501537307 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 1/23/2016 01:40:46 PM | Morris | Christopher | (302) 695-3558 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 1/18/2016 08:56:39 PM | 1-28577700955 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/20/2016 | CHILLER #7 Capacity Control Inspection, Diagnosis, and Evaluation of any Repairs Necessary. - This work is in response to DuPont Powerhouse Operators reporting erratic operation of Chiller #7's Capacity Control Pre-Rotation Vanes and a Vibration Shutdown Fault. - If substantial repairs are determined to be necessary, a separate quote will be provided to cover the additional Labor and Materials involved. |
Cozza | Y | JMORRIMM | 6501537148 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 1/20/2016 08:56:41 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/18/2016 01:03:53 PM | 1-28571115916 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/29/2016 | Due: 1/18 Desc: Chiller #7, evaluate replacement of rupture discs. Svc Hrs: N/A Access: N/A Contact: Raul Cozza 302-695-7842 Caller: JCI mech Kevin Fraze 302-353-0315 |
Cozza | Y | JMORRIMM | 6501537255 | Shah | CSHAHJJ | HVAC-Equipment | JCI Main US | JCI US Main | Morris | Raul | (302) 695-7842 | JCI Main US | Urgent | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 11/5/2015 08:43:08 AM | 1-26693184827 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Molybdate Corrosion Inhibitor in quantities specified by recent Lithium Bromide lab analysis for each ABSORBER. *This quote is for MATERIAL ONLY. Labor for adding Inhibitor will be covered under the current Maintenance Contract.* |
Cozza | Y | JMORRIMM | 6501505894 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 11/7/2015 08:43:10 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 10/30/2015 01:08:14 PM | 1-26526940839 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 10/30/2015 | Replace defective Purge Solenoid Valves (1SOL) on ABSORBER #1 and ABSORBER #2. Current valves were not properly sealing when closed, causing the Absorber Logic Board to cease "Smart" Auto-Purge Operation, and requiring Operators to Manually purge the Purge Tank while in Absorbers are in operation. Return Purges to Auto-Mode and Inspect Operation. **Quote DOES NOT include the price of the New Solenoid Valves. These were already purchased and billed to DuPont on a previous job.** |
Cozza | Y | JMORRIMM | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 11/1/2015 01:08:16 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 10/3/2015 06:05:14 AM | 1-25700650894 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 11/16/2015 | Preventive Maintenance | Skilton | N | Administrator | JMORRIMM | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 10/5/2015 06:05:16 AM | Morris | 1-BM4H6LE | 1-BQV79A9 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 9/24/2015 07:50:30 AM | 1-25343174313 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish qty-12 York Oil Filters p/n 025-11225-000 Shipping included |
Cooper | Y | JMORRIMM | 6501485253 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 9/26/2015 07:50:31 AM | Morris | Christopher | (302) 695-3558 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 9/14/2015 10:58:28 AM | 1-25030777306 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/18/2015 | ABS#1 - Troubleshoot Smart Purge Repair | Cozza | Y | JMORRIMM | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 9/16/2015 10:59:02 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 9/14/2015 10:54:08 AM | 1-25030508963 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/15/2015 | ABS#4 - Troubleshoot main solution pump. | Cozza | Y | JMORRIMM | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 9/16/2015 10:55:40 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 9/8/2015 01:33:43 PM | 1-24856075192 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/15/2015 | Absorber #2 in alarm | Cozza | Y | JMORRIMM | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 9/10/2015 01:36:54 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/19/2015 12:18:08 PM | 1-24241567558 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/27/2015 | Troubleshoot issue with ABS#4 – Motor tripping off on overloads - ABS#4 Refrig Pump Motor Removal, Rebuild and Replacement with new motor. | Cozza | Y | JMORRIMM | 6501469316 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 8/21/2015 12:23:29 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/17/2015 04:11:36 PM | 1-24187391580 | DUPONT EXPERIMENTAL STATION | L&M | Closed | YORK Parts ONLY for ABSORBER #4 (All Parts are New and should be Replaced when Motor/Rotor/Impeller Assembly is pulled): Refrigerant Pump Motor Motor Front and Rear Bearings Pump Casing Wearing Ring Motor Side Wearing Ring Impeller Fastening Hardware Pump Casing Gasket Motor Contactor & Overload Assembly All parts are available at are Baltimore Parts Center in Limited Quantities. |
Cozza | Y | JMORRIMM | 6501469316 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 8/19/2015 04:11:38 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 8/17/2015 10:45:30 AM | 1-24173921374 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/19/2015 | Chiller 8 - Troubleshoot PVR issue | Cozza | Y | JMORRIMM | 6501524856 | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 8/19/2015 10:49:15 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 8/5/2015 02:47:19 PM | 1-23822214702 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/10/2015 | Troubleshoot Absorber Ref. Pump #4. | Cozza | Y | 2670593 | JMORRIMM | 6501469316 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 8/7/2015 02:52:04 PM | Morris | Raul | (302) 695-7842 | GNCM94230017 | Absorption, Chiller, <= 2250 Tons | YPC-ST-22G-46-C-X-A | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 6/11/2015 09:52:37 AM | 1-22014279916 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/12/2015 | Defective auto purge actuator. | Cozza | Y | JMORRIMM | 6501441353 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 6/13/2015 09:53:31 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/5/2015 10:23:43 AM | 1-21813419439 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/20/2015 | Building 336 - Troubleshoot chiller operation | Cozza | Y | JMORRIMM | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 6/7/2015 10:26:23 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 6/2/2015 10:32:55 AM | 1-21689841312 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/02/2015 | Chiller #9 - Oil leak | Cozza | Y | JMORRIMM | 6501455439 | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 6/4/2015 10:34:19 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 5/7/2015 09:36:54 AM | 1-20800016829 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/18/2015 | Panel for Aborsober #1 blew out. | Cozza | Y | JMORRIMM | 6501434411 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 5/9/2015 09:37:31 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 5/7/2015 09:00:28 AM | 1-20798887284 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish qty-1 55 gallon drum of new York "K" oil. Shipping included. |
Cozza | Y | JMORRIMM | 6501426534 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 5/9/2015 09:00:29 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 5/6/2015 01:35:17 PM | 1-20772877187 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Supply 36 Solution filters for Absorber #2. | Cozza | Y | JMORRIMM | 6501426354 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 5/8/2015 01:35:18 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 5/1/2015 06:00:00 AM | 1-19763475372 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/08/2015 | Preventive Maintenance | Skilton | N | Administrator | JMORRIMM | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 4/3/2015 09:14:04 AM | Morris | 1-4QVS2QA | 1-4T3MX42 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 4/14/2015 01:14:48 PM | 1-20136654284 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/14/2015 | Chiller #7 low oil pressure | Cozza | Y | JMORRIMM | LOX612634 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 4/16/2015 01:16:13 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 4/1/2015 06:00:00 AM | 1-18893440282 | DUPONT EXPERIMENTAL STATION | PSA | Closed | Preventive Maintenance | Skilton | N | Administrator | JMORRIMM | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 3/3/2015 08:13:39 AM | Morris | 1-4QVS2QA | 1-4T3MX42 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||
| 2/6/2015 09:38:40 AM | 1-18202458640 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/25/2015 | Furnish and install qty-1 new compressor shaft seal on Chiller #7. m/n OM3000 s/n MRP626904 Lock out / Tag out all energy sources Recover refrigerant into chiller reciever Disconnect coupling between gearbox and compressor Check and record compressor alignment readings Check and record compressor axial thrust reading Install new compressor shaft seal Reassemble compressor coupling Pressure test and evacuate chiller Recharge chiller with recovered refrigerant Exclusions: Additional refrigerant charge if needed Leak repairs other than compressor shaft seal |
Cozza | Y | JMORRIMM | LOX611091 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 2/8/2015 09:38:41 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/1/2015 06:00:00 AM | 1-17237691041 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 03/20/2015 | Preventive Maintenance | Skilton | N | Administrator | JMORRIMM | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 1/3/2015 10:54:09 AM | Morris | 1-4QVS2QA | 1-4T3MX42 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 1/23/2015 03:31:54 PM | 1-17767611385 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Material Only - Provide (6) 392 10719 000 KIT, FILTER and (6) 028 08312 001 KIT, REPL GASKETS | Cozza | Y | JMORRIMM | LOX610743 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 1/25/2015 03:31:56 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 1/16/2015 08:49:25 AM | 1-17578850663 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/22/2015 | Furnish and install qty-4 new transducers and qty-8 new temperature sensors on Chiller #9. Connect all wiring and verify operation of each device. |
Cozza | Y | JMORRIMM | LOX610534 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 1/18/2015 08:49:26 AM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 12/10/2014 01:05:48 PM | 1-16741327980 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish gasket material for York Absorption chillers. qty-300 ft of Bulb gasket material qty-25 ft of baffle gasket material |
Cooper | Y | JMORRIMM | LOX609895 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 12/12/2014 01:05:49 PM | Morris | Christopher | (302) 695-3558 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 12/1/2014 06:00:00 AM | 1-15599227365 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 06/22/2015 | Preventive Maintenance | Skilton | N | Administrator | JMORRIMM | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 11/3/2014 11:59:06 AM | Morris | 1-4QVS2QA | 1-4T3MX42 | Diane | (302) 695-2288 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 10/31/2014 02:22:11 PM | 1-15566817791 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/30/2015 | Rebuild compressor on Chiller #9. m/n OTT4G2-ZBES s/n GACM117864 Lock out / tag out all energy sources Recover and store all refrigerant using plant recovery system Disconnect compressor coupling Disconnect all compressor piping Set up rigging and lower compressor to ground Record compressor thrust and runout readings Disassemble entire compressor and evaluate all parts Furnish and install new compressor bearings and gaskets Record compressor thrust and runout readings after rebuild Rig compressor onto chiller Reconnect all piping Pressure test system with nitrogen and leak test Check and adjust motor alignment as needed Reassemble compressor coupling Evacuate system and charge with recovered refrigerant Run chiller and check operation Provide all documentation Note: Pricing per chiller. |
Cozza | N | Morris | 52600015 | JMORRIMM | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 11/2/2014 02:42:18 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Shared Resource to Projects | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||
| 10/15/2014 02:20:18 PM | 1-15112969639 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Parts only. Provide Two Three way Valves for the installation of dual relief valves on Chiller #8 and #9 | Cozza | Y | JMORRIMM | LOX608468 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 10/17/2014 02:20:19 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 10/15/2014 02:14:15 PM | 1-15112209612 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 10/31/2014 | Provide Corrosion Inhibitor for the Absorption Chillers Per the Solution Analysis. Provide the labor to charge the inhibitor into the Absorbers. | Cozza | Y | JMORRIMM | LOX608467 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 10/17/2014 02:14:16 PM | Morris | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 10/8/2014 06:05:26 AM | 1-14907457363 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 11/04/2014 | Preventive Maintenance | BAFFONE | N | Administrator | JMORRIMM | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 10/10/2014 06:05:27 AM | Morris | 1-4QVS2QA | 1-4T3MX42 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 8/8/2014 05:51:53 PM | 1-13001254857 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/19/2014 | De-crystalize ABS #2 in the powerhouse (PO Req##68377) | Cooper | Y | JMORRIMM | LOX606511 | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 8/10/2014 05:52:21 PM | Morris | Christopher | (302) 695-3558 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/1/2014 06:00:00 AM | 1-11933135666 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 08/20/2014 | Preventive Maintenance | BAFFONE | N | Administrator | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 7/3/2014 09:09:02 AM | 1-4QVS2QA | 1-4T3MX42 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||
| 7/2/2014 04:08:22 PM | 1-11975635560 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/02/2014 | Troubleshoot the E336 Chiller | Sommerfield | Y | CSTETST | LGGC22452 | Mark Sommerfield | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 7/4/2014 04:11:32 PM | Stetson | Mark | (302) 218-9942 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 6/30/2014 03:35:16 PM | 1-11907374430 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/02/2014 | Chiller #7 oil leak | Cozza | Y | CSTETST | LOX606606 | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 7/2/2014 03:35:48 PM | Stetson | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 6/27/2014 08:15:47 AM | 1-11825182709 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/27/2014 | Absorber #4 - Solution pump tripped on overload. | Cozza | Y | CSTETST | LOX606593 | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 6/29/2014 08:16:15 AM | Stetson | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 6/25/2014 03:01:21 PM | 1-11773195658 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/25/2014 | Absorber #2 crystallized. Steam shut off valvle is passing | Cozza | Y | CSTETST | LOX605366 | Raul Cozza | Morris | JMORRIMM | HVAC-Equipment | JCI Main US | JCI US Main | 6/27/2014 03:03:17 PM | Stetson | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||
| 5/1/2014 06:00:00 AM | 1-9803714643 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 06/24/2014 | Preventive Maintenance | BAFFONE | N | Administrator | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 4/3/2014 08:27:57 AM | 1-33NUPXD | 1-359HQG7 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||
| 3/26/2014 11:18:38 AM | 1-9687624328 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/22/2014 | INCLUDED • Disassemble and remove existing Pin Relief Valve. • Provide and install a 3 Way Isolation valve • Provide and install two rupture disk and Disk Holders. • Provide new Gaskets and Bolts Reinstall Spring loaded relief disks after the rupture disks. NOT INCLUDED • Piping modifications needed to connect out of the dual relief assembly to the common header • New spring relief Valve Partial Billing of $13016.54 PO from Dupont Remaining amount of $4000.00 will be billed when valves come in |
Skilton | Y | CSTETST | LOX597574 | Walsh | CWALSHJEINACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/28/2014 11:18:39 AM | Stetson | Diane | (302) 695-2288 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/13/2014 01:03:31 PM | 1-9416568627 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/22/2014 | Replace all Transducers and Temperature Sensors on CH 10 Order a backup set of sensors and transducers for spare parts. |
Cozza | Y | CSTETST | LGGC21128 | Walsh | CWALSHJEINACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/15/2014 01:03:33 PM | Stetson | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 3/6/2014 09:48:11 AM | 1-9307117648 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish qty-1 55 gallon drum of new York "J" oil. Furnish qty-3 5 gallon containers of new York "J" oil. Shipping included. Pricing: York "J" oil 5 gallon container $756.00 each. York "J" oil 55 gallon container $8,427.00 |
Skilton | Y | CSTETST | LOX600371 | Walsh | CWALSHJEINACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/8/2014 09:48:13 AM | Stetson | Diane | (302) 695-2288 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 2/14/2014 11:34:26 AM | 1-8972377924 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/14/2014 | Tube Plugging during Eddy Current Test on the Evaporator Tubes CH#6 | Cozza | Y | CJOHNSP1INACT-PENDING | LGGC20932 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 2/16/2014 11:34:27 AM | Johnson | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/12/2014 11:16:58 AM | 1-8936306112 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Eddy Current test the condenser and sub cooler tubes on Chiller #6 Provide a detailed report on the condition of the tubes The tubes must be cleaned prior to testing. Exclusions Tube cleaning Tube Plugging |
Cozza | Y | CJOHNSP1INACT-PENDING | LOX598048 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 2/14/2014 11:16:59 AM | Johnson | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 2/4/2014 02:11:46 PM | 1-8817876517 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/14/2014 | Perform Eddy Current Test on the Evaporator Tubes CH#6 Provide a detailed report of the test Tubes must be cleaned prior to testing Exclusions Tube Cleaning Tube Plugging Head Removal |
Cozza | Y | CJOHNSP1INACT-PENDING | LOX598757 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 2/6/2014 02:11:47 PM | Johnson | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 2/1/2014 06:00:00 AM | 1-8239142748 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 04/23/2014 | Preventive Maintenance | BAFFONE | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 1/3/2014 08:31:10 AM | Johnson | 1-33NUPXD | 1-359HQG7 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 1/21/2014 08:42:23 AM | 1-8552733559 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/25/2014 | * Mobilize/lock out equipment *Recover Refrigerant *Dissassemble and Inspect Compressor. Record Existing Tolerances *Reassemble Compressor with new bearings, seals, and gaskets *Realign motor to compressor *Pressure test and leak test the unit *Evacuate and recycle the refrigerant into the unit *Start, Teat and Adjust Not Included *Additional Refrigerant *Required Scaffolding |
Cozza | Y | CJOHNSP1INACT-PENDING | LOX597975 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/23/2014 08:42:25 AM | Johnson | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/20/2014 10:08:00 AM | 1-8542784246 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/21/2014 | Plugging a tube on a chiller | Cozza | Y | CJOHNSP1INACT-PENDING | LGGC20800 | Williams | CWILL367INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/22/2014 10:08:45 AM | Johnson | Raul | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/10/2014 09:10:49 AM | 1-8412597585 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/13/2014 | *Eddy current test the condenser tubes * Provide report on the condition of the tubes * Tubes must be cleaned prior to the test Exclusions Tube cleaning Head removal Tube plugging |
Cozza | Y | CJOHNSP1INACT-PENDING | Raul Cozza | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/12/2014 09:10:50 AM | Johnson | Raul | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 1/8/2014 07:28:42 AM | 1-8363544161 | DUPONT EXPERIMENTAL STATION | L&M | Closed | INCLUDED • Disassemble and remove existing Pin Relief Valve. • Provide and install a 3 Way Isolation valve • Provide and install two rupture disk and Disk Holders. • Provide new Gaskets and Bolts Reinstall Spring loaded relief disks after the rupture disks. NOT INCLUDED • Piping modifications needed to connect out of the dual relief assembly to the common header • New spring relief Valve |
SLIWINSKI | Y | CWALSHJEINACT-PENDING | LOX597574 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/10/2014 07:28:43 AM | Walsh | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 12/1/2013 06:00:00 AM | 1-7368924475 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 01/21/2014 | Preventive Maintenance | BAFFONE | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 11/3/2013 08:00:02 AM | Johnson | 1-33NUPXD | 1-359HQG7 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||
| 10/4/2013 01:23:26 PM | 1-7276250083 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 10/05/2013 | Temp adjustment Bldg E336 | BAFFONE | Y | CJOHNSP1INACT-PENDING | Carol Baffone | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 10/6/2013 01:34:15 PM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 10/2/2013 12:58:10 PM | 1-7265537958 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish Lithium Molybdate inhibitor in qty-3 absorption chillers as needed based on analysis results. | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX589867 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 10/4/2013 12:58:12 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | |||||||||||||||||||||||||
| 8/20/2013 06:53:58 PM | 1-7103037037 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/28/2013 | Absorber #4 micro gateway is not communicating | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LMCH11867 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/22/2013 06:55:44 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | DUPONT EXPERIMENTAL STATION-GROUP | ||||||||||||||||||||||||
| 8/1/2013 06:00:00 AM | 1-6925972819 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 09/06/2013 | Preventive Maintenance | SLIWINSKI | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 7/3/2013 12:25:46 PM | Johnson | 1-33NUPXD | 1-359HQG7 | TOM | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 7/16/2013 08:56:14 AM | 1-6969912043 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/16/2013 | ABSORBER CHILLER #2 DOWN | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX589867 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 7/18/2013 08:58:12 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 7/10/2013 08:41:58 AM | 1-6950972053 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/31/2013 | Add lithium Bromide to absorber #2 | Sliwinski | Y | CJOHNSP1INACT-PENDING | LOX591186 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 7/12/2013 08:41:59 AM | Johnson | Tom | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 6/26/2013 11:25:37 AM | 1-6900000669 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/26/2013 | Labor to install inhibitor in Absorber Chiller | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX589867 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/28/2013 11:27:06 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 6/25/2013 11:40:53 AM | 1-6895023658 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/25/2013 | PROBLEM WITH ABSORBER CHILLER #9 | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX589867 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/27/2013 11:43:08 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 6/18/2013 10:53:25 AM | 1-6869910154 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish Lithium Molybdate inhibitor in qty-3 absorption chillers as needed based on analysis results. | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX590515 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/20/2013 10:53:26 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 6/5/2013 07:22:10 AM | 1-6829119961 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/05/2013 | DE-CRYSTALIZED ABSORBER #2 | Sliwinski | Y | CJOHNSP1INACT-PENDING | LOX589867 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/7/2013 07:24:42 AM | Johnson | Tom | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 5/1/2013 06:00:00 AM | 1-6608989438 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/03/2013 | Preventive Maintenance | BAFFONE | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 4/3/2013 08:35:36 AM | Johnson | 1-2CTMZKJ | 1-2GEM8RO | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 4/29/2013 08:55:34 AM | 1-6696323989 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/30/2013 | Proposal to plug chiller 9 and chiller 10 | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX588443 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 5/1/2013 08:55:35 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 4/17/2013 02:12:58 PM | 1-6662123802 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/23/2013 | Provide eddycurrent testing on all condenser and evaporator tubes on chillers #8, 9, and 10. Note: Head removal and tube cleaning provided by others. CH-8 m/n OTT4G2-ZBES s/n GACM117864 CH-9 m/n OTT4G2-ZBES s/n GACM127698 CH-10 m/n OTT4G2-ZBES s/n GACM127699 |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX583374 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 4/19/2013 02:12:59 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/28/2013 01:05:48 PM | 1-6482766674 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/11/2013 | Rupture disk replacement Chiller 8 and two spare disks. 8 hours labor to include: Three Disks One Disk Holder |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX585576 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/2/2013 01:05:49 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/25/2013 09:10:57 AM | 1-6465393059 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Furnish qty-1 55 gallon container of York "K" oil | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX585468 | Stetson | CSTETST | HVAC-Equipment | JCI Main US | JCI US Main | 2/27/2013 09:10:59 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 2/1/2013 01:00:00 AM | 1-6247036719 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 03/04/2013 | Preventive Maintenance | BAFFONE | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 1/3/2013 10:51:20 AM | Johnson | 1-2CTMZKJ | 1-2GEM8RO | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 1/16/2013 08:44:00 AM | 1-6308784998 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/31/2013 | Budgetary proposal to rebuild compressor on Chiller #8. m/n OTT4G2-ZBES s/n GACM117864 Lock out / tag out all energy sources Recover and store all refrigerant using plant recovery system Disconnect compressor coupling Disconnect all compressor piping Set up rigging and lower compressor to ground Record compressor thrust and runout readings Disassemble entire compressor and evaluate all parts Furnish and install new compressor bearings and gaskets Record compressor thrust and runout readings after rebuild Rig compressor onto chiller Reconnect all piping Pressure test system with nitrogen and leak test Check and adjust motor alignment as needed Reassemble compressor coupling Evacuate system and charge with recovered refrigerant Run chiller and check operation Provide all documentation Note: Pricing per chiller. 50,066.00 |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX583896 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/18/2013 08:44:02 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 12/1/2012 01:00:00 AM | 1-6002646799 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 03/02/2013 | Preventive Maintenance | BAFFONE | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 11/3/2012 11:41:50 AM | Johnson | 1-2CTMZKJ | 1-2GEM8RO | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 11/19/2012 08:58:12 AM | 1-6073656448 | DUPONT EXPERIMENTAL STATION | L&M | Closed | MATERIAL ONLY Furnish qty-1 55 gal. drum of York "K" oil |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX581421 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 11/21/2012 08:58:13 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 9/1/2012 01:00:00 AM | 1-5587255578 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 03/14/2013 | Preventive Maintenance | BAFFONE | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 8/3/2012 01:43:04 PM | Johnson | 1-2CTMZKJ | 1-2GEM8RO | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 8/29/2012 07:48:22 AM | 1-5710749030 | DUPONT EXPERIMENTAL STATION | L&M | Closed | PARTS ORDER DuPont Experimental Station Absorber #2 m/n YPCST226-46-CXA s/n GADM248980 • Furnish and install qty-1 new absorber pump impeller. • Run unit and check operation. |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LDFS25135 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/31/2012 07:48:24 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 8/2/2012 10:08:53 AM | 1-5591819781 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/29/2012 | Repair Absorber #2 Solution Pump. Furnish and install qty-1 new pump motor with repair kit. Furnish and install qty-1 new pump overload relay Furnish and install qty-1 new pump contactor. Start pump and check operation. |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LGGC16834 | Williams | CWILL367INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/4/2012 10:08:54 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 8/1/2012 01:00:00 AM | 1-5515764727 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 08/02/2012 | Preventive Maintenance | BAFFONE | N | Administrator | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 7/21/2012 07:35:37 AM | Johnson | 1-2CTMZKJ | 1-2GEM8RO | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | Non billable SR | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 7/30/2012 04:43:50 PM | 1-5570855801 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/30/2012 | ABSORBER PUMP DOWN | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | Tom Sliwinski | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/1/2012 04:47:23 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 6/12/2012 10:07:39 AM | 1-5326338169 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/02/2012 | Use PO LGGC16318 DuPont Experimental Station Wilmington, DE • Furnish and install Lithium Molybdate inhibitor in qty-4 absorption chillers as needed based on analysis results. |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LGGC16318 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/14/2012 10:07:40 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 6/5/2012 08:32:45 AM | 1-5291903176 | DUPONT EXPERIMENTAL STATION | L&M | Closed | Use PO # LOX574005 • Furnish qty-2 new purge transducers p/n 025-29907-002. |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX574005 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/7/2012 08:32:47 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 5/25/2012 08:19:31 AM | 1-5238056088 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/07/2012 | DuPont Experimental Station Absorber #3 m/n YPCST226-46-CXA s/n GADM233620 • Respond to service call on unit shutting down on “High first stage generator temperature”. • Run unit through de-crystallization procedure. • Apply external heat to liquefy stubborn areas. • Run unit and check operation. |
Sliwinski | Y | CJOHNSP1INACT-PENDING | LGGC16094 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 5/27/2012 08:19:32 AM | Johnson | Tom | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 5/1/2012 01:00:00 AM | 1-4963268475 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/29/2012 | Preventive Maintenance | BAFFONE | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 4/2/2012 02:33:51 PM | Johnson | 1-1BU3WG6 | 1-1EN3RF2 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 4/3/2012 08:32:12 AM | 1-4972943318 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/24/2012 | USE PO# LGGC15615 Chiller #10 Job Scope: Furnish and install qty-1 Norris Valve seal kit. • Lock out / Tag out all energy sources. • Furnish and install qty-1 valve O-ring kit for free cooling valve. • Pressurize and leak check new valve. • Clean up chiller. • Check operation. • Note: Refrigerant recovery and recharge performed by others. |
Sliwinski | Y | CWALSHJEINACT-PENDING | LGGC15615 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 4/5/2012 08:32:13 AM | Walsh | Tom | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 4/3/2012 08:27:24 AM | 1-4972942980 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/05/2012 | Use PO#LGGC15614 Chiller #9 Job Scope: Furnish and install qty-1 Norris Valve seal kit. • Lock out / Tag out all energy sources. • Furnish and install qty-1 valve O-ring kit for free cooling valve. • Pressurize and leak check new valve. • Clean up chiller. • Check operation. • Note: Refrigerant recovery and recharge performed by others. |
Sliwinski | Y | CWATTSGAINACT-PENDING | LGGC15614 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 4/5/2012 08:27:25 AM | Watts | Tom | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 3/12/2012 09:02:34 AM | 1-4856238148 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/04/2012 | Use PO#LGGC15395 DuPont Experimental Station Chiller #8 m/n LKC-73 Job Scope: Furnish and install qty-1 Norris Valve seal kit. •Lock out / Tag out all energy sources. •Furnish and install qty-1 valve O-ring kit. •Pressurize and leak check new valve. •Check operation. |
SLIWINSKI | Y | CWALSHJEINACT-PENDING | LGGC15395 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/14/2012 09:02:35 AM | Walsh | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 3/9/2012 04:28:07 PM | 1-4849659201 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/10/2012 | BLDG 336 CHILLER IN ALARM | BAFFONE | Y | CJOHNSP1INACT-PENDING | LGGC15435 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/11/2012 04:30:08 PM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/29/2012 01:13:12 PM | 1-4794930239 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/21/2012 | THIS IS 2 OF 2 ( PARTIAL BALANCE ) Original SR 1-4712912261 has been billed for $12,000.00 USE PO# LGGC14985 DuPont Experimental Station Chiller #8 m/n LKC-73 Job Scope: Furnish and install qty-1 new compressor shaft seal. • Lock out / Tag out all energy sources. • Recover and weigh entire refrigerant charge using plant recovery system. • Disassemble compressor coupling. • Remove and replace compressor shaft seal. • Leak test entire chiller with nitrogen. • Evacuate chiller and perform vacuum hold test. • Check coupling alignment using laser alignment tool. • Reassemble compressor coupling. • Charge chiller with recovered refrigerant. • Furnish and install 20 gallons of new compressor oil. • Run chiller and check operation. |
Sliwinski | Y | CHEGARRINACT-PENDING | LGGC14985 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/2/2012 01:13:13 PM | Hegarty | Tom | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/14/2012 12:00:37 PM | 1-4712912261 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/25/2012 | USE PO# LGGC14985 DuPont Experimental Station Chiller #8 m/n LKC-73 Job Scope: Furnish and install qty-1 new compressor shaft seal. Lock out / Tag out all energy sources. Recover and weigh entire refrigerant charge using plant recovery system. Disassemble compressor coupling. Remove and replace compressor shaft seal. Leak test entire chiller with nitrogen. Evacuate chiller and perform vacuum hold test. Check coupling alignment using laser alignment tool. Reassemble compressor coupling. Charge chiller with recovered refrigerant. Furnish and install 20 gallons of new compressor oil. Run chiller and check operation. |
SLIWINSKI | Y | CWALSHJEINACT-PENDING | LGGC14985 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 2/16/2012 12:00:38 PM | Walsh | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/1/2012 01:00:00 AM | 1-4458302276 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/09/2012 | Preventive Maintenance | BAFFONE | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 1/3/2012 07:44:33 AM | Johnson | 1-1BU3WG6 | 1-1EN3RF2 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 1/22/2012 03:17:42 PM | 1-4574444162 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 01/07/2012 | DuPont Experimental Station Chiller #7 m/n OM5000 s/n MRP626904 Job Scope: •Premium time for work performed by Mike Ianovale and Joe Fisher on Saturday 1-7-12. |
SLIWINSKI | Y | CHEGARRINACT-PENDING | LGGC14883 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/24/2012 03:17:44 PM | Hegarty | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 1/17/2012 11:12:57 AM | 1-4544978844 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/30/2012 | use po# LGGC14775 DuPont Experimental Station Chiller #7. • Furnish and install qty-1 new additional bursting disk relief indicators for refrigerant relief valves. • Isolate, lock out and tag out valves as required. • Disassemble assembly and clean all gasket surfaces. • Furnish and install new bursting disk and gaskets. • Leak test assembly. |
SLIWINSKI | Y | CSTETST | LGGC14775 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/19/2012 11:12:58 AM | Stetson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 12/5/2011 10:15:10 AM | 1-4311150501 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 12/14/2011 | USE PO# DuPont Experimental Station Chiller #7 m/n OM5000 s/n MRP626904 • Furnish qty-1 new seal end compressor bearing. • Furnish qty-1 new Pump end compressor bearing. • Furnish qty-1 new reverse thrust bearing. |
Sliwinski | Y | CHEGARRINACT-PENDING | LGGC14480 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 12/7/2011 10:15:11 AM | Hegarty | Tom | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 12/1/2011 01:00:00 AM | 1-4191187406 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 01/10/2012 | Preventive Maintenance | Sliwinski | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 11/12/2011 07:33:27 AM | Johnson | 1-1BU3WG6 | 1-1EN3RF2 | Tom | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 12/1/2011 01:00:00 AM | 1-4138658401 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/10/2012 | Preventive Maintenance | SLIWINSKI | N | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 11/2/2011 12:43:02 PM | 1-1BU3WG6 | 1-1EN3RF2 | TOM | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | PSA Repair | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 11/29/2011 03:14:49 PM | 1-4276984327 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/04/2012 | USE PO# LGGC14336 DuPont Experimental Station Chiller #7. • Furnish and install qty-5 new bursting disk relief indicators for refrigerant relief valves. o Qty-2 disks on Chiller #7 Evaporator o Qty-2 disks on refrigerant recovery receiver. o Qty-1 disk on refrigerant recovery unit. • Isolate, lock out and tag out valves as required. • Disassemble assemblies and clean all gasket surfaces. • Furnish and install new bursting disks and gaskets. • Leak test each assembly. |
SLIWINSKI | Y | CHEGARRINACT-PENDING | LGGC14336 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 12/1/2011 03:14:50 PM | Hegarty | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 11/29/2011 01:30:54 PM | 1-4276011500 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 12/23/2011 | USE PO#LGGC14336 DuPont Experimental Station Chiller #7 m/n OM5000 s/n MRP626904 Job Scope: Perform compressor bearing inspection and coupling alignment on qty-1 York OM chiller. • Lock out / Tag out chiller. • Transfer refrigerant charge to storage vessel using plant transfer system. • Disassemble compressor coupling. • Check and record compressor shaft runout and thrust readings. • Drain oil from compressor. • Dissemble compressor oil sump cover and oil pump. • Remove and inspect front compressor bearing. • Disassemble compressor shaft seal. • Remove and inspect rear compressor bearing. • Reassemble both compressor bearing assemblies with new gaskets. • Furnish and install new compressor shaft seal. • Recheck compressor runout and thrust readings. • Install new compressor oil and filters. (Supplied by customer) • Pressurize compressor with nitrogen and leak test. • Disassemble motor to gearbox coupling. • Check and record alignment of both couplings using laser tool and dial indicators. • Adjust alignments if needed to bring within factory specs. • Perform coupling maintenance. • Reassemble both couplings. • Evacuate system and perform vacuum hold test. • Recharge chiller with recovered refrigerant. • Check chiller operation. • Provide all documentation. |
SLIWINSKI | Y | CHEGARRINACT-PENDING | LGGC14336 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 12/1/2011 01:30:55 PM | Hegarty | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 11/29/2011 01:24:19 PM | 1-4276011474 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/11/2012 | USE PO# LGGC14377 DuPont Experimental Station Absorbers. #1 m/n YPCST22G46CXA s/n GLCM157836. #2 m/n YPCST22G46CXA s/n GBDM248980. #3 m/n YPCST22G46CXA s/n GADM233620. #4 m/n YPCST22G46CXA s/n GNCM9423001. Job Scope: Furnish and install new non-fragmenting type bursting disks and disk holders on each chiller. (Qty-2 per chiller. Total of qty-8). •Lock out / Tag out chiller. •Remove old carbon type disks and gaskets. •Re-fabricate piping as needed to accept new disk holders. •Furnish and install new disks and disk holders. •Pressurize and leak check around new bursting disks. •Provide all documentation. |
SLIWINSKI | Y | CHEGARRINACT-PENDING | LGGC14377 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 12/1/2011 01:24:20 PM | Hegarty | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 11/3/2011 01:18:59 PM | 1-4160013757 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 11/01/2011 | USE PO# LGGC14145 DuPont Experimental Station Absorber #2 m/n YPCST22G46CXA s/n GBDM248980 Job Scope: Troubleshoot low refrigerant temperature alarm. • Lock out / Tag out chiller • Check refrigerant flow to spray headers. • Change refrigerant pump. (Pump supplied by customer) • Check chiller operation. • Provide all documentation. |
SLIWINSKI | Y | CHEGARRINACT-PENDING | LGGC14145 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 11/5/2011 01:19:00 PM | Hegarty | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 9/22/2011 11:16:01 AM | 1-3896106608 | DUPONT EXPERIMENTAL STATION | Material Only | Closed | Material Order for (1) "55 Gallon Drum of K-Oil (011 00534 000) and (1) "5 Gallon drum of K-Oil (011 00533 000). | Skilton | Y | CHEGARRINACT-PENDING | LOX559651 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 9/24/2011 11:16:02 AM | Hegarty | Diane | (302) 695-2288 | JCI Main US | Routine | Material Only Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 9/13/2011 09:40:48 AM | 1-3832679073 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/13/2011 | CHILLER #3 DOWN | Sliwinski | Y | CJOHNSP1INACT-PENDING | LGGC12820 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 9/15/2011 09:43:53 AM | Johnson | Tom | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 8/10/2011 09:36:55 AM | 1-3614184300 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/10/2011 | POWER FAILURE - CHILLER DOWN | Sliwinski | Y | CJOHNSP1INACT-PENDING | LGGC12820 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/12/2011 09:38:35 AM | Johnson | Tom | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 8/1/2011 01:00:00 AM | 1-3314236480 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 11/04/2011 | Preventive Maintenance | BAFFONE | N | CKULSKKINACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 7/3/2011 07:50:45 AM | Kulski | 1-1BU3WG6 | 1-1EN3RF2 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 7/13/2011 08:51:02 AM | 1-3395663956 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/28/2011 | Use PO# LMCH10247 DuPont Experimental Station Absorption Chillers #3 and #4 Absorber #3 m/n YPCST22G46CX s/n GADM233620 Absorber #4 m/n YPCST22G46CX s/n GNCM9423001 • Furnish and install Adva-Guard 591 chemical inhibitor for qty-2 York Absorption Chillers based on solution analysis results.. • Chiller #3…… 2.7 lbs. • Chiller #4…….2.82 lbs. |
BAFFONE | Y | CHEGARRINACT-PENDING | LMCH10247 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 7/15/2011 08:51:04 AM | Hegarty | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 7/6/2011 02:33:58 PM | 1-3350806150 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/06/2011 | TROUBLESHOOT AND REPAIR THE #10 CHILLER AT E315 | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LMCH10237 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 7/8/2011 02:36:41 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 7/1/2011 01:00:00 AM | 1-3073406829 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 07/22/2011 | Preventive Maintenance | BAFFONE | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 6/4/2011 10:40:27 AM | Johnson | 1-1BU3WG6 | 1-1EN3RF2 | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 5/12/2011 11:09:10 AM | 1-2913970345 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/12/2011 | ABSORBER PM'S | Sliwinski | N | 2670593 | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 5/14/2011 11:16:31 AM | Johnson | 1-DXUV6F | 1-EOSB6J | Tom | (302) 695-7842 | GNCM94230017 | Absorption, Chiller, <= 2250 Tons | YPC-ST-22G-46-C-X-A | JCI Main US | Routine | HVAC-Equipment | Scheduled Maintenance | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||
| 5/1/2011 01:00:00 AM | 1-2635588274 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 06/01/2011 | Preventive Maintenance | BAFFONE | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 4/2/2011 09:39:27 AM | Johnson | 1-DXUV6F | 1-EOSB6J | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 4/14/2011 12:17:03 PM | 1-2720351788 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 04/30/2011 | Dupont Experimental Station Building 336. York YCAS190 Chiller. • Furnish and install qty-1 new condenser fan motor, fan blade, and blade mounting hardware. (Fan #7). • Furnish and install qty-1 new suction temperature sensor. • Furnish and install qty-1 new oil pressure transducer. • Start chiller and check operation. • Note: All work to be performed on a Saturday. NOT DONE |
BAFFONE | Y | CHEGARRINACT-PENDING | LGGC10244 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 4/16/2011 12:17:04 PM | Hegarty | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 3/30/2011 11:08:41 AM | 1-2627851260 | DUPONT EXPERIMENTAL STATION | PSA | Closed | PURGE PUMP MAINT. | BAFFONE | N | 2675068 | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 4/1/2011 11:17:54 AM | Johnson | 1-DXUV6F | 1-EOSB6J | CAROL | (302) 218-9996 | Block Hours - Chiller Heavy | JCI Main US | Routine | HVAC-Equipment | Scheduled Maintenance | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||
| 3/16/2011 04:34:21 PM | 1-2548420121 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 03/19/2011 | E336 CHILLER SERVICE CALL..... (waiting on parts to hit job) |
BAFFONE | Y | CJOHNSP1INACT-PENDING | LGGC9754 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 3/18/2011 04:36:22 PM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/16/2011 03:55:40 PM | 1-2382254821 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/25/2011 | Use PO # LGGC8974 DuPont Experimental Station Chiller #8. m/n OTT4G2-2BES s/n GACM117864 Furnish and install qty-1 new oil pump shaft seal kit on chiller #8. Remove and weigh refrigerant charge from chiller using plant recovery / transfer system. Disassemble oil pump and install new pump shaft seal kit. Pressurize chiller with nitrogen and leak test. Evacuate and recharge chiller with recovered refrigerant. Check oil pump operation. |
BAFFONE | Y | CJOHNSP1INACT-PENDING | LGGC8974 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 2/18/2011 03:55:40 PM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/4/2011 02:56:34 PM | 1-2322219561 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 02/22/2011 | DuPont Experimental Station York Chiller #7. USE PO# LGGC8619 Furnish and install qty-1 new Monitech LCD display monitor on chiller control panel. Note: The Monitech display is an aftermarket display which replaces the tube only and utilizes the existing panel interface. ( No programming required). The original display is no longer available. |
BAFFONE | Y | CJOHNSP1INACT-PENDING | LGGC8619 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 2/6/2011 02:56:36 PM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 2/1/2011 01:00:00 AM | 1-2145850208 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/13/2011 | Preventive Maintenance | BAFFONE | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 1/3/2011 11:00:00 AM | Johnson | 1-DXUV6F | 1-EOSB6J | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 1/18/2011 03:16:38 PM | 1-2224249835 | DUPONT EXPERIMENTAL STATION | Material Only | Closed | MATERIAL ORDER FOR (6) OIL FILTERS FOR YORK CHILLERS. QUOTED AMOUNT $219.90. | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LOX548915 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 1/20/2011 03:22:17 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Material Only Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 12/27/2010 08:05:45 AM | 1-2110929898 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 12/28/2010 | •Furnish and install qty-10 new gaskets on bursting disk relief indicators for refrigerant relief valves. •Isolate, lock out and tag out valves as required. •Disassemble assemblies and clean all gasket surfaces. •Furnish and install new gaskets. •Leak test each assembly. |
BAFFONE | Y | CJOHNSP1INACT-PENDING | CAROL BAFFONE | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 12/29/2010 08:05:46 AM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 12/18/2010 09:09:45 AM | 1-2083406911 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 12/18/2010 | YCAS190 chiller was experiencing a low temperature alarm. | BAFFONE | Y | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 12/20/2010 09:11:54 AM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 12/8/2010 09:55:59 AM | 1-2031869374 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 12/20/2010 | Provide Eddy current testing on all condenser and evaporator tubes on Chiller #7. Furnish detailed report of tube condition in hard copy and PDF format. Note: Condenser and evaporator heads must be removed and all tubes must be brush cleaned before testing can begin. (Performed by others). |
BAFFONE | Y | CJOHNSP1INACT-PENDING | LGGC7651 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 12/10/2010 09:55:59 AM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 12/1/2010 01:00:00 AM | 1-1828518509 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 11/15/2010 | Preventive Maintenance | BAFFONE | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 11/2/2010 12:25:53 PM | Johnson | 1-DXUV6F | 1-EOSB6J | CAROL | (302) 218-9996 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 11/15/2010 09:56:06 PM | 1-1907409794 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 11/26/2010 | ABSORBER SHUTDOWN | SLIWINSKI | N | 2675067 | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 11/17/2010 09:58:53 PM | Johnson | 1-DXUV6F | 1-EOSB6J | TOM | (302) 695-7842 | Block Hours - Chiller Heavy | JCI Main US | Routine | HVAC-Equipment | Scheduled Maintenance | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 10/5/2010 10:18:51 AM | 1-1693076316 | DUPONT EXPERIMENTAL STATION | Material Only | Closed | MATERIAL QUOTE FOR INHIBITOR. | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LMCH10247 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 10/7/2010 10:34:41 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Material Only Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 9/23/2010 03:50:07 PM | 1-1617871854 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 09/27/2010 | Furnish and install qty-1 new keypad for Absorption chiller #1. | BAFFONE | Y | CJOHNSP1INACT-PENDING | LDFS25135 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 9/25/2010 03:50:10 PM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 8/14/2010 10:31:20 AM | 1-1384543671 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/14/2010 | REPAIRS TO RTU BLDING 336 (WEEKEND ACCESS) | BAFFONE | Y | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/16/2010 10:32:27 AM | Johnson | CAROL | (302) 218-9996 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 8/9/2010 08:17:01 PM | 1-1357550573 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 09/21/2010 | Preventive Maintenance | SLIWINSKI | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 8/11/2010 08:17:05 PM | Johnson | 1-DXUV6F | 1-EOSB6J | TOM | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 8/9/2010 04:42:45 PM | 1-1356202728 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 09/30/2010 | OPERATIONAL SSV'S | SLIWINSKI | N | 2675067 | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/11/2010 04:44:22 PM | Johnson | 1-DXUV6F | 1-EOSB6J | TOM | (302) 695-7842 | Block Hours - Chiller Heavy | JCI Main US | Routine | HVAC-Equipment | Scheduled Maintenance | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 8/4/2010 02:19:51 PM | 1-1329193316 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/05/2010 | ABSORBER #2 DOWN ON LOW REFRIGERANT | Sliwinski | Y | CJOHNSP1INACT-PENDING | LGGC4301 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/6/2010 02:26:28 PM | Johnson | Tom | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 7/30/2010 02:48:27 PM | 1-1297135051 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 08/03/2010 | ABS 2 Leak Repairs | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LGGC4301 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 8/1/2010 02:49:41 PM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 7/23/2010 10:17:43 AM | 1-1249898436 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/24/2010 | REPAIRS TO RTU IN BLDG 336. FIRST CALL - SERVICE CALL ON SATURDAY. |
Barnes | Y | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 7/25/2010 10:22:41 AM | Johnson | PAUL | (302) 218-9996 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 7/12/2010 11:10:31 AM | 1-1189019721 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 07/30/2010 | PARTIAL BILLING - PURGE UNIT ON #2 CHILLER MALFUNCTIONING. | Sliwinski | Y | CJOHNSP1INACT-PENDING | LGGC4301 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 7/14/2010 11:19:25 AM | Johnson | Tom | (302) 695-7842 | JCI Main US | Routine | Labor & Material | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 6/14/2010 08:52:58 AM | 1-1021703411 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 07/06/2010 | CHILLER #3 OFFLINE | SLIWINSKI | N | 2670592 | CJOHNSP1INACT-PENDING | LGGC4301 | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/16/2010 08:54:53 AM | Johnson | 1-DXUV6F | 1-EOSB6J | TOM | (302) 695-7842 | Absorption, Chiller, <= 2250 Tons | JCI Main US | Routine | HVAC-Equipment | PSA Repair | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||
| 6/9/2010 09:15:12 AM | 1-996861621 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 06/12/2010 | Perform seasonal maintenance on qty-1 YCAS0190 air-cooled chiller. Clean all condenser coils with pressure washer. Change compressor oil filter. Leak check entire chiller.Perform oil and refrigerant analysis. Check all condenser fan motors and blades. Check all chiller safeties and controls. Megger test compressor motor. Check compressor starter and tighten all connections. Start chiller and check operation. Note: All work to be performed on overtime. |
SLIWINSKI | Y | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/11/2010 09:15:13 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | ||||||||||||||||||||||||||
| 6/1/2010 09:24:32 AM | 1-951443420 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 06/09/2011 | PM ON ABSORBERS | SLIWINSKI | N | 2675067 | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 6/3/2010 09:38:59 AM | Johnson | 1-DXUV6F | 1-EOSB6J | TOM | (302) 695-7842 | Block Hours - Chiller Heavy | JCI Main US | Routine | HVAC-Equipment | Scheduled Maintenance | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 5/26/2010 08:45:31 AM | 1-904072214 | DUPONT EXPERIMENTAL STATION | L&M | Closed | 05/27/2010 | FINISH AND INSTALL (1) NEW LOW REFRIGERANT TEMP SWITCH. | SLIWINSKI | Y | CJOHNSP1INACT-PENDING | LGGC24TS | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 5/28/2010 08:45:32 AM | Johnson | TOM | (302) 695-7842 | JCI Main US | Routine | Custom Quote | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||||
| 5/13/2010 08:14:16 AM | 1-832516755 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 05/28/2010 | BASIC SEASONAL MAINT. | SLIWINSKI | N | 2675067 | CJOHNSP1INACT-PENDING | Johnson | CJOHNSP1INACT-PENDING | HVAC-Equipment | JCI Main US | JCI US Main | 5/15/2010 08:16:51 AM | Johnson | 1-2B83-1683 | ENTL:92607131-28091 | TOM | (302) 695-7842 | Block Hours - Chiller Heavy | JCI Main US | Routine | HVAC-Equipment | Scheduled Maintenance | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||
| 5/1/2010 01:00:00 AM | 1-672193722 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 08/09/2010 | Preventive Maintenance | SLIWINSKI | N | CJOHNSP1INACT-PENDING | Administrator | A2020003 | HVAC-Equipment | JCI Main US | JCI US Main | 4/16/2010 07:57:02 AM | Johnson | 1-2B83-1683 | ENTL:92607131-28090 | TOM | (302) 695-7842 | JCI Main US | PM Committed | HVAC-Equipment | Scheduled Service | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | 260 Delmarva North Team SVC | USD | DUPONT EXPERIMENTAL | |||||||||||||||||||||||
| 3/30/2010 09:06:39 AM | SR:92607131 | DUPONT EXPERIMENTAL STATION | PSA | Closed | 04/08/2010 | Vendor PO Data Conversion USE ONLY - DO NOT USE SR FOR CREATING NEW CONTRACT ACTIVITIES | N | Administrator | EIMADMIN | HVAC-Equipment | JCI Main US | JCI US Main | 1-2B83-1683 | ENTL:92607131-28090 | JCI Main US | Routine | HVAC-Equipment | PSA Repair | Closed | JOHNSON CONTROLS SALISBURY WILMINGTON CB - 0N28 | DUPONT EXPERIMENTAL |